Bridge Road Swing Bridge Realignment, Exeter
“I had the great opportunity to both lead the design, and project manage this scheme including an element of site supervision. We needed to alter the alignment of Bridge Road at the Swing Bridge to allow two lanes of traffic over the structure. This formed part of a much larger scheme to increase capacity along Bridge Road and unlock developments in the south west of Exeter.
Permanently rotating the bridge was a complicated and welcome challenge. I applied my engineering skills to solve problems, extend and alter structures, and move bearings etc to accommodate the new bridge position. My designs were drawn up and my structure specific specification elements contributed to the tender package.
Once a Contractor was appointed under an NEC3 Option A contract I formed part of the site team overseeing the construction works and dealing with the contract management. The experience I gained from this scheme was invaluable and I thoroughly enjoyed working on it right from the planning stages to successful completion.”