Context

Photo of flooding in Axminster showing the Axe floodplain and B3261 road inundated with floodwater on 7 December 2023 (photo credit: Local Resident received via Environment Agency)

This flood investigation report has been produced by Devon County Council as a Lead Local Flood Authority under Section 19 of the Flood and Water Management Act 2010.

Version Undertaken byReviewed byApproved byDate
 Draft 1Thomas AldridgeJessica BishopMartin Hutchings02/05/2024
     
     

This report covers the flooding incident between 4th and 7th December 2023 and has identified all flooded properties within the County that we have been able to determine or brought to our attention. The Council would like to thank Chris Khan and other officers from the Environment Agency Flood Resilience Team for their significant input into this report.

1. Introduction

The Flood Risk Regulations 2009 and the Flood and Water Management Act 2010  (the Act) have established unitary and upper tier local authorities as the Lead Local Flood Authority (LLFA) for their area. This has placed responsibilities on the LLFA in relation to flood risk management and in particular Section 19 of the Act which states:

Flood and Water Management Act 2010: Section 19 – Local Authorities: investigations   On becoming aware of a flood in its area, a lead local flood authority must, to the extent that it considers it necessary or appropriate, investigate – which risk management authorities have relevant flood risk management functions, andwhether each of those risk management authorities has exercised, or is proposing to exercise, those functions in response to the flood.Where an authority carries out an investigation under subsection (1) it must – publish the results of its investigation, andnotify any relevant risk management authorities.   Flood and Water Management Act (2010), S.19, c.29, London: HMSO  

A ‘Risk Management Authority’ (RMA) means:

            (a) the Environment Agency (EA),

            (b) a lead local flood authority,

            (c) a district council for an area for which there is no unitary authority,

            (d) an internal drainage board,

            (e) a water company, and

            (f) a highway authority.

When considering if it is necessary or appropriate to investigate a flood event Devon County Council (DCC) will review the severity of the incident, the number of properties affected and the frequency of such an occurrence. Devon’s Local Flood Risk Management Strategy clearly sets out the criteria to be used when considering a Flood Investigation Report.

Although not all of the locations in this report meet the significance threshold of 5 or more properties flooded, to ensure that the full extent of the flooding is appreciated and recorded it has been decided to include all locations brought to our attention which experienced any internal property flooding, and also other areas of particular concern.

In partnership with the other RMAs in Devon this report has been produced to comply with legislation and to determine the main causes of the flooding. It should be noted that in order to progress with their flood risk management function DCC has opted to develop this report further by considering the various actions that should be considered by the relevant RMA. DCC as the LLFA will continue to monitor the list of actions with all of the RMAs and will assist in the delivery where practical to do so.

It should be noted that this report is only based on the information brought to the attention of DCC through its professional partners, the media and the public and where further investigation by the authorities have identified additional flooded properties. Therefore, it cannot be guaranteed to contain an exact or exhaustive list of individual properties or affected communities.

Please note, reports of flood depths vary between metric and imperial measures depending on whether they have been measured or reported by others. To avoid giving the impression of precise depth measurements it has been actively chosen to not convert any imperial measurements provided by members of the public into metric measurements. For the purposes of clarity 1 inch would normally convert to 2.54cm.

Each affected area or group of smaller areas investigated within this report will have a number of recommended actions to be taken forward by the relevant RMAs or in some cases, by the landowner or local community action group. There are various levels of action that can be taken depending on the severity of the situation and the practical solutions available to reduce the risk of further flooding. The recommended actions will generally fall into one of the following categories:

Delivery of Quick win schemes: a solution that can be implemented quickly by the Risk Management Authorities or Local Authority at relatively low cost; some of these have already been completed as this report has been progressed.

Further investigation/research: Further investigations such as catchment studies and hydrological/hydraulic assessments to understand the flow rates and directional paths and evaluate the extent of flooding. These would provide evidence for future capital investment.

Development of future schemes: Where immediate action is not financially viable or a solution not readily available then a larger scale flood alleviation scheme may be required. In such cases national funding would need to be secured together with additional contributions from others, such as local levy, local authorities and other third parties.

Landowner action: Members of the public who own land adjacent to watercourses have riparian responsibilities and therefore have a duty to maintain their section of watercourse to ensure there is no impediment of flow. Other works to protect their property may also need to be funded by themselves to ensure delivery within their timescales.

Community action: In some cases, it may be prudent for community groups to join forces and deliver and maintain their own local schemes. There may be opportunities to  generate further contributions from local levy or the LLFA.

This investigation report will provide a starting point, with suggested actions being further refined in the light of further studies and where possible, through further dialog with the affected communities.

Recommended Actions:   The purpose of this report is to act as a tool for all of the relevant RMAs to understand and appreciate the extent of flooding in their area and to consider and prioritise those actions relevant to their authority. Due to the extent of flooding, not only from the events covered in this report, but the level of recommended actions also far exceeds the budgets and resources available to enable them to be delivered immediately. Although we take all flooding issues seriously it should therefore be appreciated that some actions may not be progressed within the timescales expected by some residents or communities. Every effort will be made to progress the actions if and when suitable funding is obtained.   The recommended actions highlighted in this report will be used by the LLFA to monitor progress achieved by the RMAs.  

2. Risk Management Authority Responsibilities

2.1 Recording Flood Incidents

LLFAs must record flood incidents as part of their duties under the Flood and Water Management Act. The information below shows the national guidance given as part of the Preliminary Flood Risk Assessment Spreadsheet submission to the EA, which outlines information to be collected by LLFAs.

Information the LLFA must record

Devon County Council (DCC) will record this on the DCC flood incident database:

  • Start Date
  • Days duration
  • Probability
  • Main source: surface water runoff; groundwater; ordinary watercourses; artificial infrastructure; main rivers; the sea; no data
  • Main mechanism: natural exceedance; defence exceedance; failure; blockage or restriction; or no data
  • Main characteristics: natural flood; flash flood; deep flood; snow melt flood; no data
  • Significant consequences:
    • To human health (residential properties)
    • To economy (non-residential properties)
    • To the environment (designated sites flooded)

2.2 Key Responsibilities

RMAs in Devon all have their own roles and responsibilities. The general RMA responsibilities in relation to flood risk and surface water management are outlined below:

The Environment Agency is responsible for managing the risk from the sea, Main Rivers and reservoirs and has a strategic overview role for all flood risk management, making it a key local partner for DCC, especially when managing the risk from combined sources and in the event of a large flood incident. The EA also provides a flood warning service throughout England and Wales in areas at risk of flooding from rivers or the sea.

Devon County Council as the Lead Local Flood Authority is responsible for overseeing the flood risk from ordinary Watercourses, groundwater and surface water runoff. They are also responsible for consenting to works on ordinary Watercourses and enforcing the removal of any unlawful structure or obstruction within the watercourse. And, as previously stated they must ensure that a flooding investigation is carried out by the relevant authority and publish a report. DCC must also prepare a Local Flood Risk Management Strategy and maintain a register of flood risk assets.

Local District Councils are classified as land drainage authorities with discretionary powers under the Land Drainage Act, such as the implementation and maintenance of flood defences on ordinary watercourses. They also have powers under the Public Health Act to ensure the removal of any blockage within an ordinary Watercourse that is considered a nuisance. As a planning authority they are responsible for the preparation of development plans and making decisions based on planning policy.

Devon County Council as the Highway Authority maintains the highway drainage system to reduce the amount of standing water on the highway. This is achieved by limiting the water on the roads and ensuring that they are kept clear of rainwater; including the maintenance of highway gullies and culverts.

National Highways is responsible for managing, maintaining and improving the Motorway and trunk roads across England and any associated drainage and flood risk.

South West Water (The Water Company) is responsible for the public sewerage network including foul, surface water and combined systems together with any associated assets such as pumping stations, sewage treatment works and combined sewer overflows.

Land/Property Owners that have a watercourse in or adjacent to their land have riparian responsibilities on that watercourse. This means the landowner must:

  • Let water flow through their land without any obstruction, pollution or diversion which affects the rights of others.
  • Accept flood flows through their land, even if these are caused by inadequate capacity downstream.
  • Keep the banks clear of anything that could cause an obstruction and increase flood risk, either on their land or downstream if it is washed away.
  • Maintain the bed and banks of the watercourse and the trees and shrubs growing on the banks and should also clear any litter or debris from the channel and banks, even if it did not come from their land.
  • Keep any structures, such as culverts, trash screens and debris grills, weirs and mill gates, clear of debris.

The LLFA must also take an overseeing role to ensure that all flood risk is being managed appropriately.

In small, localised groundwater and surface water flooding incidents which do not reach the threshold level to trigger a flood investigation by the LLFA under Section 19, the Local Authorities will work in partnership to consider the appropriate action.

All RMAs have a duty to co-operate and to share information in relation to their flood risk management functions.

3. Incident Summary

3.1 Incident Summary

On 4th and 7th December, significant flooding was experienced across the River Axe catchment, causing flooding to 20 properties[JB1] . The River Axe overtopped its banks on both days with 7 of the 20 properties reporting flooding incidents on both 4th and 7th December, and drainage systems became overwhelmed from large amounts of surface water runoff, which led to multiple properties flooding in Devon. In total, 20 properties suffered internal flooding (19 residential and 1 commercial) in Axminster and 3 properties in Musbury.

24-hour radar rainfall accumulation to 3pm on 4th December 2023 estimates approximately 60-80mm of rainfall to have fallen in the Axe Catchment area, see Figure 1.

Figure 1: Radar rainfall accumulation in the preceding 24 hours up to 3pm on Monday 4 December 2023 across Southwest England.

Then 24-hour radar rainfall accumulation, from 4.45pm 6th December 2023 to 4.45pm on 7th December 2023, estimates up to 50mm of rainfall to have fallen in the Axe Catchment area, see Figure 2.

Figure 2: Radar rainfall accumulation in the preceding 24 hours up to 4.45pm on 7 December December 2023 across Southwest England.

The above Figures 1 and 2 visualise the significant amount of localised rainfall affecting the Axe Catchment in particular. These estimates are correlated by rain gauge data at Forde Abbey upstream of Weycroft on the River Axe. The rain gauge recorded 134mm over 3 days which is in line with the estimates from the rainfall radar.

The River Axe has river level gauges with data publicly available, those referenced within this report are shown in Figure 3.

Figure 3: Map from Environment Agency Live Flood Map showing River Axe gauge locations (Forde Abbey and Weycroft).

River Axe levels peaked on 7 December at 2:30pm with heights of 2.75m recorded on the Forde Abbey gauge, as seen in Figure 4. Peak levels recorded on the 4 December 2023 at 11:45am were heights of 2.72m. For context, the highest level on record is 2.99m on 7 July 2012, however, historic events are not directly comparable due to subsequent flood risk reduction works.

Figure 4: Graph showing the Environment Agency’s gauged peak flows for the River Axe at their gauge by Forde Abbey between 29 November and 11 December 2023, Y Axis showing level measured in metres.

The river level peaked on the Axe on 7 December 2023 at 4:45pm with heights of 3.57m recorded on the Weycroft Bridge gauge, as seen in Figure 5. Peak levels recorded on 4 December 2023 at 2pm were heights of 3.35m. Both dates show a peak 2 hours 15 minutes after the upstream gauge at Forde Abbey.

Figure 5: Graph showing the Environment Agency’s gauged peak flows for the River Axe at their gauge on Weycroft Bridge between 29 November and 10 December 2023, Y Axis showing level measured in metres.

Table 1 lists the towns and villages affected on this date together with the reported number of properties flooded in each location.  Rainfall data for the event is visualised in Figures 1 and 2. It should be noted that the flooded locations have been reported alphabetically and not in any order of priority.

LocationNumber of properties floodedSource of flooding
East Devon
Axminster20Main river
Musbury3Main river/ordinary Watercourse
Total properties flooded: 23
Table 1: List of towns and villages affected

3.2 Impacts on the highway network

During this event between 4th and 7th December, significant surface water flooding affected the highway network across the Axminster area. The road network in areas around Axminster were inundated due to high water levels within the Axe floodplain rendering two of the main access routes into Axminster impassable. As part of the investigation, it will be recommended that Devon County Council Highways review the highway gullies and consider whether any maintenance issues require attention.

Major flooding closures/roads impassable:

  • B3261 between Axminster Town and the A35
  • A358 at Weycroft Bridge

3.3 Incident response and recovery

Initial community engagement and drop in events:

When a flood event occurs, it is immediately followed by an emergency response and then recovery phase. There are many roles involved in this process, covered by the Emergency services, Environment Agency and local authorities. Details of this are included in the Multi-Agency Flood Framework. As the LLFA, DCC’s Flood & Coastal Risk Management team becomes involved at the recovery phase. This involvesrecovery coordination, community engagement and investigation.

Following any flood event, DCC will engage with relevant District Councils, Risk Management Authorities, local Parish and Town Councils and community members to gather information. This information is shared with other agencies to determine the extent of impact and will assist in the production of the Section 19 Flood Investigation Report.

4. Flood Incident Extent and Impact: East Devon

4.1 Axminster

Figure 6: Map of River Axe floodplain near Axminster

Axminster has an extensive floodplain area (Figure 6) with the properties affected located within the River Axe floodplain. The event was a long duration high rainfall event, so the more rapidly responding catchments such as the Milbrook and Gamberlake streams that drain to the Axe weren’t associated with any internal flooding in this incident.

All the Axminster properties internally flooded in this incident have a history of flooding in the last 25 years. Flooding has occurred previously prior to EA raising defences along the Axe with major 21st Century incidents on 20 October 2021 (9 properties at Weycroft), 7 July 2012 (67 properties) and 31 December 2000 (11 properties at Stoney Bridges). There is extensive historic flood outlines and data for the Axe flooding in the Axminster area that is not detailed within this report and is available from the Environment Agency upon request.

Upstream of Weycroft, Axminster on the River Axe

Flooding was reported upstream of Axminster along the Axe in South Somerset including at Chard Junction, Forde Abbey and Greenham. It is not clear that property numbers were significantly high enough to warrant a separate report under section 19 of the Flood and Water Management Act by Somerset Council. Further details on the flooding upstream of Devon can be obtained by contacting the Environment Agency and/or Somerset County Council directly.

Two properties just under half a mile upstream of Weycroft experienced flooding reportedly 2 inches deep with water seeping through walls and under the floor. A third property here avoided internal flooding due to property flood resilience measures installed despite external areas flooding reportedly 2 feet deep.

Weycroft, Axminster A total of eight properties were recorded as internally flooding at Weycroft, broad locations shown for Weycroft and Stoney Bridges in Figure 7. Several other properties reported external flooding with near misses as water levels were just below threshold levels.

Figure 7: showing locations of internal property flooding in the Weycroft and Stoney Bridges areas of Axminster

A sluice board on the leat marked approximately below on Figure 8 by the green circle was damaged significantly during the event on Monday 4th December with residents downstream reporting increased flows down the leat in the event on Thursday 7th December.

On 7th December. Residents reported levels rising by 10 foot in a 5-minute period in the leat with the increased flowpath shown by the red arrow in Figure 8.

Figure 8: Broken sluice board (green circle) and flowpath (red arrow) in Weycroft on 7 December 2023.

Four properties reported water from the leat entering through the wall and the floor around 3pm on 7th December with flood depths of 5 to 10 inches internally. Three other properties reported flooding to 12 inches deep internally.

The worst affected property was along the A358 at Weycroft which saw internal flood depths of 1.5m deep shown in Figure 9.

Figure 9: shows a red line marking the height that floodwaters reached within the worst affected property at Weycroft.

A resident at Weycroft and their pet were rescued during the incident by the Axminster Fire Station, with the Fire Service busy over the 4th to 7th December with multiple rescues where vehicles had driven into floodwaters through road closed signs (Figure 10).

Figure 10: Image from Axminster Fire Station showing a vehicle trapped in floodwaters on 7th December.

Stoney Bridges, Axminster

Nine properties reported internal flooding on Castle Hill near Stoney Bridge, Axminster, referred to as Stoney Bridges area of Axminster within this report. Flood depths reported between 3 inches to 14 inches internally with flooding occurring from the River Axe at 3.30pm.

Flows overtopped the Environment Agency’s flood defence bank on the right-hand bank of the Axe upstream of Stoney Bridge (Figure 11). Flows emerged out of farm tracks and accesses onto Castle Hill west and east of Blackhakes Farm, flowing down Castle Hill Road itself. This was similar in impact and flow routes as the incident in July 2012.

Figure 11: Environment Agency flood defence bank upstream of Stoney Bridge overtopping on 4 December also re-occurred to a greater extent on 7 December (Photo via Environment Agency)
Figure 12: Photo looking from Railway level crossing toward the upstream end of Stoney Bridge before peak flows on 4 December, with 7 December having an even higher flood peak (Photo via Environment Agency).

4.2 Musbury

Figure 13: showing locations of internal property flooding in Musbury, Devon.

Three properties in total flooded internally in the Musbury area with their general locations highlighted in Figure 13.

Two properties on Whitford Road situated within the main river floodplain reported internal flooding around 4pm on 7 December with one seeing 4 inches internally and the other reporting one inch depth internally from the River Axe. Both properties have previously flooded to greater depths on 7 July 2012.

A property on Whitford Road with privately installed property flood resilience measures was able to prevent internal flooding during this incident. A property on Seaton Road reported internal flooding from where an unmapped ordinary watercourse overtopped adjacent to the property. Flows from Combpyne Road and fields feed this ditch network which then is culverted under a farm access. Flows overtopped at the farm access and at an access point further downstream which appears to have been blocked either before or during the incident and ran down adjacent agricultural land causing flooding to property. Recommendations have been made to the tenant to clear the network.

As a result of this investigation report, several recommendations have been made for actions to be taken in specific locations. These are either as a result of initial site or desktop investigations, or the continuation of works or investigations already in progress. DCC as the LLFA will continue to monitor and record all flood incidents that come to our attention and consider this within our action plan and future investment programme. The current action plan can be found on the DCC Flood Risk Management Website at https://www.devon.gov.uk/floodriskmanagement/. Table 2 below summarises the recommended actions for this flood incident.

As stated earlier in this document, the purpose of this report is to act as a tool for all the relevant RMAs to understand and appreciate the extent of flooding in their area and to consider and prioritise those actions relevant to their authority.

The recommended actions highlighted in this report will be used by the LLFA to monitor progress achieved by the RMAs.

Action ByRecommended ActionHow
General actions recommended for the areas featured in this chapter:
EA /LLFA / Local communitiesIncrease community resilience to all affected communities.Where applicable assist with the development of community emergency/flood action plans. Advice and possible funding available from Devon Community Resilience Forum.
DCC Highways / National HighwaysTo ensure efficient operation of highway drains and culverts.Review and carry out maintenance in problem areas
District Council / EA / LLFATo ensure flood risk is managed from new development.Encourage sustainable drainage practices for new developments.
Property Owners / LLFA / EAConsider flood risk to own properties.To install property level protection where necessary in liaison with appropriate Risk Management Authorities.
SWWEnsure efficient operation of public combined and surface water sewers.Continue maintenance regime and consider storm separation where appropriate.
In addition to the general actions the following should be considered at specific locations:
Action ByRecommended ActionHow
EADetailed investigation and review of Axminster Flood model for the affected areasFurther assessment of the flood risk areas
EAConsider Property Flood Resilience for the affected propertiesLiaise with property owners and survey properties as required
Table 2. Recommended actions for the affected communities in Devon.

6. Next Steps

The next steps following this report will be for DCC as the LLFA to ensure that the recommended action tables in each chapter are presented to the responsible Risk Management Authority. DCC will consider their actions in line with other priorities and monitor delivery through regular reviews, whilst working in partnership with the EA, District Councils, South West Water and the local communities affected.

There is an expectation from DCC of itself and its partners that all authorities involved will cooperate and work together to improve the flood risk in the vulnerable areas identified in this report by completing the recommended actions. As the LLFA, DCC has a responsibility to oversee the delivery of these actions.

Where minor works and quick win schemes have been identified, these will be prioritised and subject to available funding and resources will be carried out as soon as possible by the relevant authority or landowner. Any major works requiring capital investment will be considered through the EA’s Medium-Term Plan process.

A review of the actions will be carried out by DCC as the LLFA to monitor progress and encourage delivery of recommended actions.