Road repair history and maintenance – A377 towards Exeter before the bridge over the River Taw B3227

Regarding the A377 towards Exeter before the bridge over the River Taw B3227, please provide:

1. A copy of your current road maintenance policy for the road. Please send me the full policy, this should include details of the intended frequency of road safety inspections, how these inspections should be conducted and the maximum time between identification of a defect and repairs being carried out.

This information can be found in Devon County Council’s Highway Safety Policy.

2. A copy of the road repair history for that road over the last year. Including, dates of all safety inspections between 22 October 2021 and 21 December 2021 – details of how safety inspections were undertaken (walked or driven, speed of inspection vehicle etc.) – details of all carriageway defects identified, with description date and time – details of how the authority handled these defects, what repairs were undertaken and the time between the identification of each defect and a repair being carried out.

The repair history for this road can be viewed on this Devon County Council webpage.