Electric Vehicle Charge Points

1) How many public Electronic Vehicle (EV) charging devices are available in your authority?

2) The total number of rapid charging devices (providing power at between 50kW and 100kW):

3) The total number of ultra rapid chargers (providing power at 100kW and above):

For questions 1-3, Devon County Council (DCC) do not hold this information, although it can be found on resources including the National Chargepoint Registry (NCR) Public Electric Vehicle Chargepoints and ZapMap.

4) How many public EV chargers have you installed for each of the last five years? How many of these have been rapid or ultra rapid? (if you are unable to include information for 5 years, please include as far back as you can. If you are unable to provide rapid / ultra rapid breakdown, please provide total)

2020 0
2021 0
2022 21
2023 87
2024 (up to current date) 2

5) In the last five years, how much in GBP has your local authority invested in electrical vehicle charging infrastructure? (if you are unable to include information for 5 years, please include as far back as you can)

2020:

2021:

2022:

2023:

2024 (up to current date):

DCC enabled public EV chargepoints are operated using concessions contracts, with the majority of funding provided by the private sector.  In 2021, the DELETTI contract delivering chargepoints in public car parks was awarded to Scottish Power.  A maximum total contribution of up to £250,000 was made available, with the winning bidder chosen partly on the total contribution they would require. The majority of this funding was provided by the European Regional Development Fund (ERDF) and a proportion of this funding required by the winning bidder (Scottish Power).

Other chargepoints enabled by DCC and operated by Wenea are fully funded by Wenea.

6) What percentage of your public EV charging devices were fully operational (without faults being reported) for the last 6 and 12 months.

We have largely been in the delivery phase of EV projects to date, so do not hold this data for the previous 6 or 12 months currently.

7) How many parking spaces with public charging facilities did you provide across your local authority during the following years? (If unable to provide a break down please share total)

2020 0
2021 0
2022 10 (DCC) 22 (district councils)
2023 72 (DCC) 36 (district councils)
2024 4 (DCC)