How much did the Sweetbriar lane cycle lane cost to implement

Exeter North South Sweetbriar Lane then the total cost in previous years was £128,543.76 plus 23/24 projected cost of £3,500, totals £132,043.76.

Exeter HATOC report 13/10/20 (PTE/20/29) approved a budget of £250k

Who was responsible for mismeasuring the width of the sweetbriar lane cycle lane 

A provisional measurement was advised by the design team using the available mapping data at the time. The carriageway actual width was discovered at the detailed design stage following a more detailed survey of Sweetbriar Lane, which provided detailed geometries. We do not have details of individual names of staff.

What further risk assessment was carried out in relation to completing the cycle lane with an incorrect carriage way width 

The carriageway width issue was discussed at October 2021 HATOC.

See attached link for more details, including how risks were assessed (see section 9 of the  Environment, Economy and Culture Directorate Committee Report – Standard Format (devon.gov.uk)

Has Sweetbriar lane cycle lane exceeded its budget and if so has this been reported accordingly and if so to whom has this been reported?

Please see the above response regarding the cost.

What is the further outcome from the emergency services in particular the South West Amublance Service in relation traversing Low Traffic Neighbourhood bollards

All correspondence with the emergency services is available in the following Freedom of Information Request: Heavitree and Whipton Active Street Trial – Freedom of information (devon.gov.uk)

Are there any other tasks in relation to the Sweetbriar lane cycle lane left to implement 

No

Was the Sweetbriar lane cycle lane subject to any additional costs over and above the funding applied for and if so by how much and by which method were these funded. If additional funding was received which schemes were these funds diverted from

Exeter Highways and Traffic Order Committee approved the Sweetbriar Lane scheme with a cost of £250,000 (as described above) funded from £50,000 Section 106 from Matford Green and £200,000 Emergency Active Travel Fund Tranche 2. The total cost as detailed above was within this cost threshold.

Has any money been paid to the Exeter Cycling Campaign Group

No

Has any money been paid to any other cycling group 

No