Please supply the following information for the current fiscal year and preceding ten fiscal years relating to the stretch of highway between the junction with A388 at Stibb Cross (W3W location ///talent.ambushes.traps) and the village of Shebbear at Battledown Cross (W3W location ///feel.receiving.bristle)
1. the official designation and classification of the highway (or sections of, in the case of more than one categorisation applying);
C462 Maintenance Hierarchy 06 – Local Collector
2. the highway safety inspection frequency (or frequencies in the case of more than one categorisation applying);
6 monthly
3. a complete list of any and all Highway Safety inspection dates (by section if more than one inspection category);
4. a full and categorised list of any problems identified by each highway safety inspection;
In response to questions 3 and 4, this information can be seen at Inspections and reports
Information that is greyed out is exempt from disclosure under Section 40(2) of the Freedom of Information Act 2000 (Personal Data).
The Council cannot disclose personal information if releasing it would contravene any of the provisions in the UK General Data Protection Regulation. In this instance release of this information would contravene the first data protection principle and therefore the information is withheld
5. a full list of any other surveys undertaken, the cost and the reason for, with dates;
All C roads have an annual SCANNER survey in one direction that is carried out by WDM. So, in a 2-year period the whole section in question will have received a full survey. SCANNER is a very complex vehicle with multiple detection devices that looks at texture, ride quality, cracking and edge deterioration in extreme detail. The last SCANNER inspection on this section was carried out on 20/06/2024. This type of survey will guide us towards major surface treatment schemes only and not smaller safety related Schemes. Information is not held on the cost of the survey of this road, as the information held relates to the costs of surveying roads countywide.
We carry out the SCANNER survey on all of our network as follows
- A, B and C class annually in one direction so a 2 year process to survey it all
- Unclassified 50% annually in one direction so a 4 year process to survey it all
We also carry out SCRIM (skid resistance testing) and Deflectograph (structural condition) annually on the A Class network. More information on the 3 surveys can be obtained by visiting our contractor’s website
Road Surveying | W.D.M Limited
6. a full and categorised list of any problems identified as a result of 1. and 2. above;
We have interpreted this question to refer question 5 above.
The SCANNER data is assessed yearly and will be interrogated in the coming months as part of a countywide assessment to create new schemes.
7. a complete list of all works carried out with full details (including costs, identifying the works which were funded from capital or revenue (or government pothole or surfacing funds), and whether carried out by the Term Maintenance Contractor (including its subcontractors), or by other direct contractors to Devon County Council Highways.
The spreadsheet for Reactive Potholes and Patches undertaken by the Term Maintenance Contractor ( SDWH and M Group) can be seen at Spreadsheet
Repairs larger than 0.5 sq. m are capital funded, smaller repairs are revenue funded. The County Council does not hold information on the cost of individual highway safety defect repairs. Charging and paying for defect repairs is based on cost of labour plant and materials for a given geographical area for the billing period.
Works Orders specific to specified section of C462:-
| 2304931 – C462 Rowden Chapple to Berry Cross SHEBBEAR | 2304931 | Resurfacing | 25/7/2014 | £152,865.4 | SWH 2011 | HSM NP – Road Recovery Programme | SWH | |||
| HI142888998 | Pre works admin. | 04/04/2014 | £241.23 | SWH 2011 | HSM NP – Road Recovery Programme | SWH | ||||
| ORD2004626 | Pre works admin. | 11/04/2014 | £206.81 | SWH 2011 | HSM NP – Road Recovery Programme | SWH | ||||
| 4216173 – C462 Shebbear Road Shebbear (Cucumber Cottages to Rowden Chapel) |
ORD1902008 |
Surface Dressing | 23/04/2019 | £23,092.22 | Surface Dressing 2019-2020 | HSM NP – Surface Dressing | Kiely Bros Ltd | |||
| ORD1800414 | Patching | 07/09/2018 | £53,538.51 | Devon Highways TMC 2017 | HSM NP – PrePatching (Summer) for SD/MA 2019/20 | M Group | ||||
| ORD1801147 | Pre-SD Cleaning | 06/04/2018 | £1,484.28 | Devon Highways TMC 2017 | HSM AR – Pre SD All Rds Cleaning/Design | M Group | ||||
| ORD1803449 | Pre-SD Cleaning | 21/03/2019 | £621.08 | Devon Highways TMC 2017 | HSM AR – Pre SD All Rds Cleaning/Design | M Group | ||||
| 224303587 – C462 – Fulford Bridge to between Rowden Farm and Paddon Cottage – Shebbear CP |
ORD2202980 |
Resurfacing | 07/02/2025 | £242,752.79 | AMT Resurfacing Framework 2022-26 | HSM AR – Western NHT Locality Programme | Aggregate Industries UK | |||
| ORD2301080 | Trial Pits | 05/10/2023 | £9,102.58 | Devon Highways TMC 2017 | HSM AR – Western NHT Locality Programme | M Group | ||||
| ORD2302755 | Drainage | ? | £72,922.13 | Devon Highways TMC 2017 | HSM AR – Western NHT Locality Programme | M Group | ||||
| ORD2400896 | PreWorks Admin | 27/09/2023 | £146.95 | Devon Highways TMC 2017 | HSM AR – Western NHT Locality Programme | M Group | ||||
| W241703375 – College Road, Shebbear | ORD2400175 |
Reactive Patching (Fire) |
24/01/2024 | £17,657.44 | Devon Highways TMC 2017 | HSR & Clearance of Debris | M Group | |||
| ORD2400198 | Debris | 17/01/2024 | £509.19 | Devon Highways TMC 2017 | HSR & Clearance of Debris | M Group | ||||
| W251856816 – Road from Cucumber Cottages to Rowden Chapel, Stibb Cross | ORD2502341 | Reactive Call out – Diesel | 09/05/2025 | £117.63 | Devon Highways TMC 2017 | HSR & Clearance of Debris | M Group | |||
| 4216058 -C462 Rosehill Cross to Furze House Shebbear CP | ||||||||||
| ORD2004625 | Pre-SD Cleaning | 26/10/2020 | £3446.98 | Devon Highways TMC 2017 | HSM AR – PrePatching for SD/MA 2022/23 | M Group | ||||
| ORD2100526 | Pre-SD Cleaning | 07/05/2021 | £2763.36 | Devon Highways TMC 2017 | HSM AR – PrePatching for SD/MA 2022/23 | M Group | ||||
Total Spend = £581,468.58
HSM = Highway Structural Mainateance – Capital
HSR = Highway Safety and Reactive – Revenue