Pothole D233755033

Please provide information and photos relating to pothole D233755033, including initial reporting.

Please refer to this pothole information folder.

The original report made relating to this defect was a member of the public PIP for debris/obstruction, W231582625/D233746051. Debris/obstruction reports on this date were reviewed for action from CSS. A pothole repair –  following checks – was instructed, as it was neither an obstruction or debris issue.  This instruction was raised on D233755033, and the original D233746051 closed as no further action, with a comment that a pothole instruction had been passed to the contractor.

Station Road, Hemyock

Maintenance Category – 6 local distributor

Willand & Uffculme ED

The original report relating to D233755033:

W231582625 – PIP –  24/01/23

Debris/obstruction

21/02 – Required completion date

24/02 – Actual completion date

Public Comments: ‘Gigaclear/Obelisk trench fill is lifting above road level and breaking up’

D233746051 – CSS

Debris/obstruction

NFA – 24/02/23 (GW)

Reason For No Further Action: Pothole job raised and passed to Contractor for repair

D233755033

Pothole (Safety) – 7 days

Instructed – Milestone – NRT Team

24/03/23 – Instruction date

03/03/23 – Required completion date

01/03/23 – Actual completion date

Reactive comment – 1.4  x .4 – pothole completed.