I wish to be provided with a complete and current organisation chart of Devon County Council (DCC) Highways directorate with the formal job title of each position, the number of whole time equivalent staff in each position, and the mid-point salary for each position.
Also, please indicate which DCC Highways staff positions act as the interface between DCC and Milestone Infrastructure Ltd.
This information can be found at the following link Highways Structure.
Each member of staff is represented separately in the structure chart therefore every box is 1 Full Time Equivalent (FTE).
The focus of interface with Milestone Infrastructure Limited is through our Term Maintenance Contract and the teams under the Highways and Traffic Management Group Manager (slide 18 onwards). Of these, the following teams would not normally interface with Milestone Infrastructure Limited:-
Parking Processing Team slide 22
Parking Operations Team slide 23
Street Lighting and Traffic Signals team slide 26
Public Rights of way and Country Parks teams slide 36 and 37
Please note our main grading structure can be found at this link Main grading structure (Salary rates and scales).