What was the total cost of providing the new zebra crossing at the Bridge Motor Cycles/Lidl roundabout on Church Road, Alphington as a separate item of the Alphington Public Realm Enhancements.
The costs for the Zebra crossing were £127,153.69. This is made up of £106,713.47 for the construction works plus £20,440.22 for the street lighting works.