A39 footbridge at Bishops Tawton

Please can you provide the information below regarding a proposed A39 footbridge at Bishops Tawton (A377) junction.

a) estimated costs of design and build (to completion) including date of estimate
b) estimated costs and type of all consultancy and external support (outside DCC) related to the above
c) estimates of foot and cycle traffic use.

In response to the above questions, we can confirm that there is no proposed footbridge at this location and we therefore do not hold this information.   By way of assistance, we can confirm that a subway is proposed at this location and if you still require the above information, please feel free to return to us.