Biomass Boiler Installations

“For each biomass boiler installation in buildings owned or managed by your local authority, including, where relevant, schools which come under the local authority’s aegis, I would be grateful for the following information:-
* Council
* Biomass Asset
* Building Type (Drop down list options: School, Leisure Centre, Library, Offices, Sheltered Accommodation, Community Building, Nursing Home, Other)
* Biomass Fuel Type (Drop down list options: Pellet, Chip, Other)
* Biomass Boiler Size (kW)
* Operational Status (Drop down list options: Active/Inactive)
* RHI Claimed (Drop down list options: Yes/No)
* RHI claim amount (last 4 quarters)
* Address of Biomass Asset”

Devon County Council (DCC) has five Biomass Boiler Installations, all located within its maintained school property portfolio.  The location of the boiler installations, boiler size and fuel type are detailed in the below table.

Information relating to operational status and RHI income claimed is not held by DCC.  This information would be held by the schools concerned – contact details provided via the below links.

Location of Boiler Installation Meter Name, Boiler size and Fuel Type
Horwood And Newton Tracey Community Primary School BioMass: TBC kW – 0622_BioMass_1 – LFR WoodPellet 50kW
Bradley Barton Primary School & Nursery Unit BioMass – 0710_BioMass_1 Wood Chip –  LFR 90kW
King Edward VI Community College BioMass: TBC kW – 1003_BioMass_1 – LFR – G50  35PC-moisture 6-32mm woodchip
Ellen Tinkham School: Fed-Learn to Live BioMass: 200 kW – 1821_BioMass_1 – LFR – Heat Meter 99kW x 2 – Pellet
Cheriton Fitzpaine Primary School: Fed-Exe Valley BioMass – 4270_BioMass_1 – LFR – R1: – Pellet 70kW