“I would like to request the traffic management plans and associated traffic modelling reports that were carried out to determine the temporary traffic signal timings used on the 12.09.2019 for the resurfacing works your contractor are undertaking on London Road, Clyst Honiton between the junctions of London Road and Station Road and the junction of London Road and Clyst Honiton Bypass.”
Traffic Management Plans Phases 1 to 5 are provided. We have spoken to the Contractor who has confirmed that on 12/09/2019 there was a requirement to use Temporary Traffic Signals and these signals were manually controlled.
There is no requirement for Traffic Modelling for Manually Operated Temporary Signals. We do not, therefore, hold this information.