Cycle lane on Dryden Lane, Exete

I would like to know the cost to DCC of removing the advisory cycle lane on Dryden Lane, Exeter. This includes any consultant fees, fees for applications to change the highway and the cost of the work itself.

The removal of the advisory lane forms a part of a wider package of works for the Dryden Road modal filter scheme, which included the installation of two sets of bollards to create a modal filter, patching work, dropped kerbs, the removal of the advisory cycle lane between Well Oak Park and Barrack Road and the removal of the cycle lane on the footway/cycle way between Kipling Drive and Bovemoors Lane.

We can confirm that the cost associated with the removal of the advisory lane on Dryden Road between Well Oak Park and Barrack Road was £3,758 (this incorporates a minimum charge for removal of lining by hydroblasting). The consultancy fee for this element is estimated at £500. There is no legal order associated with the removal of the advisory cycle lane.