Contents
Core Documents
CDX.XX – Refers to identical documents for both Appeals
CDX.XXA – Refers to Appeal A
CDX.XXB – Refers to Appeal B
CD1 Original Submission
CD1.01A General Planning Application Form
CD1.01B General Planning Application Form
CD1.02A Minerals Planning Application Form
CD1.02B Minerals Planning Application Form
CD1.03A Site Location Plan – SF/116/01/2017
CD1.03B Site Location Plan – 7402/001
CD1.04A Extraction and Ancillary Development Plan – SF/2
CD1.05A Advanced Planting Plan – SF/3
CD1.06A Development Phase 1 Plan– SF/5-1
CD1.07A Development Phase 2 Plan– SF/5-2
CD1.08A Development Phase 3 Plan – SF/5-3
CD1.09A Cross Sections Plan – SF/5-4
CD1.10A Restoration Scheme Plan – SF/6
CD1.11A Birdcage Lane Access Plan – A.097/112 Rev A
CD1.12B Complex Areas Plan – 7402/002
CD1.13B Red Line Planning Application Boundary Plan – 7402/003
CD1.14B Section 278 Works Scheme Layout Sheet 1 – 0241.201 Rev A
CD1.15B Section 278 Works Scheme Layout Sheet 2 – 0241.202 Rev A
CD1.16 Planning Application Supporting Statement
CD1.17A Supporting Statement Appendix 1 – Wildlife Habitat Management Plan
CD1.18A Appendix 1 (cont.) – Safeguarding Advice Note 3
CD1.19 Environmental Statement (inc Appendices and Drawings)
CD1.20A Landscape and Visual Impact Assessment (Straitgate) (inc Appendices and Drawings)
CD1.20.1A Landscape and Visual Impact Assessment (Arboricultural Survey Report Rev 2)
CD1.20.2A Landscape and Visual Impact Assessment (EDDC Landscape Character Types – SF 5_4)
CD1.20.4A Landscape and Visual Impact Assessment (Landscape Topography – SF 5_2)
CD1.20.6A Landscape and Visual Impact Assessment (Oblique Aerial Photograph From the East SF 5_6)
CD1.20.8A Landscape and Visual Impact Assessment (Photomontage C1 to J SF 5_28 to SF 5_31)
CD1.20.9A Landscape and Visual Impact Assessment (Viewpoints 1 to 6 SF 5_24 to SF 5_27)
CD1.20.10A Landscape and Visual Impact Assessment (Viewpoints A to L SF 5_8 to SF 5_23)
CD1.20.11A Landscape and Visual Impact Assessment (ZTV of Proposed Extraction Area – SF 5_1)
CD1.21A Water Environment (Straitgate)
CD1.22A Flood Risk Assessment (Part 1 of 2)
CD1.22A Flood Risk Assessment (Part 2 of 2)
CD1.23A Hydrogeological Assessment (Part 1 of 3)
CD1.23A Hydrogeological Assessment (Part 2 of 3)
CD1.23A Hydrogeological Assessment (Part 3 of 3)
CD1.24A Ecological Assessment (Straitgate) (inc Appendices)
CD1.24A Ecological Assessment (Appendix 7.1)
CD1.24A Ecological Assessment (Appendix 7.2)
CD1.24A Ecological Assessment (Appendix 7.3)
CD1.24A Ecological Assessment (Appendix 7.4)
CD1.24A Ecological Assessment (Appendix 7.6)
CD1.24A Ecological Assessment (Appendix 7.7)
CD1.24A Ecological Assessment (Appendix 7.8)
CD1.24A Ecological Assessment (Appendix 7.9)
CD1.24A Ecological Assessment (Appendix 7.10)
CD1.24A Ecological Assessment (Appendix 7.11).pdf
CD1.25B Ecological Impact Assessment (Hillhead Quarry)
CD1.26 Transport Assessment (inc Appendices and Drawings)
CD1.26 Transport Assessment (Appendix 15)
CD1.26 Transport Assessment (Appendix 17)
CD1.26 Transport Assessment (Appendix 18)
CD1.27A Noise Impact Assessment
CD1.28A Air Quality Assessment
CD1.29A Archaeology and Cultural Heritage (inc Appendices and Drawings)
CD1.29A Archaeology and Cultural Heritage (Appendix 12-1)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 2)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 3)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 4)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 5)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 6)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 7)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 8)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 8a)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 9)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 10)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 11)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 12)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 13)
CD1.29A Archaeology and Cultural Heritage (Appendix 12- 14)
CD1.29A Archaeology and Cultural Heritage (Site Location – Drawing 1)
CD1.29A Archaeology and Cultural Heritage (ZTV and Designated Heritage Assets – Drawing 2)
CD1.29A Archaeology and Cultural Heritage (Non Designated Heritage Assets – Drawing 3)
CD1.30B Arboricultural Impact Assessment Rev 1 (Hillhead Quarry)
CD1.31A Soils and Agricultural Land Classification Report
CD1.32 Non Technical Summary (inc Drawings)
CD1.33B Landscape and Visual Impact Assessment (Clay Lane)
CD2 Initial Statutory Consultation Responses
CD2.01B MDDC Environmental Health Response – 08/03/2017
CD2.02A West & Wales Utilities Response – 09/03/2017
CD2.03A East Devon Area of Natural Beauty Response – 10/03/2017
CD2.04A Historic England Response – 14/03/2017
CD2.05B Historic England Response – 14/03/2017
CD2.06B Burlescombe Parish Council Response – 16/03/2017
CD2.07B Highways England Response – 21/03/2017
CD2.08A East Devon CPRE Response – 21/03/2017
CD2.09A Ottery St Mary Town Council Response – 21/03/2017
CD2.10A Highways England Response – 21/03/2017
CD2.11A Highways England Response Plan – 21/03/2017
CD2.12B Natural England Response – 22/03/2017
CD2.13A Whimple Parish Council Response – 23/03/2017
CD2.14A Devon Wildlife Trust Response – 27/03/2017
CD2.15A Exeter Airport Response – 28/03/2017
CD2.16A Exeter Airport Response Plan – 28/03/2017
CD2.17A Natural England Response – 39/03/2017
CD2.18B Cllr Radford Response – 30/03/2017
CD2.19A Councillor Claire Wright Response – 31/03/2017
CD2.20B Environment Agency Response – 31/03/2017
CD2.21A DCC Landscape Response – 12/04/2017
CD2.22A PROW Response – 26/04/2017
CD2.23A East Devon District Council Response – 26/04/2017
CD2.24A DCC Ecology Response – 27/04/2017
CD2.26B DCC Highways Response – 28/04/2017
CD2.27A Environment Agency Response – 28/04/2017
CD2.28A DCC Flood Risk Response – 02/05/2017
CD2.29A East Devon District Council Environmental Health Response – 16/05/2017
CD2.30B Uffculme Parish Council Response – 28/06/2017
CD2.31A Wales & West Utilities Response Email – 01/08/2017
CD2.32A Wales & West Utilities Response Letter – 01/08/2017
CD2.33A Whimple Parish Council Response – 08/08/2017
CD2.34A Highways England Response – 09/08/2017
CD2.35A Highways England Response (Attachment) – 09/08/2017
CD2.36A DCC Historic Environment Response – 09/08/2017
CD2.37B DCC Historic Environment Response – 09/08/2017
CD2.38A HSE (National Quarries) Response – 10/08/2017
CD2.39B HSE (National Quarries) Response – 10/08/2017
CD2.40A Exeter Airport Response – 11/08/2017
CD2.41B Burlescombe Parish Council Response – 16/08/2017
CD2.42A Public Health England Response – 24/08/2017
CD3 Applicant / Authority Correspondence
CD3.01A Regulation 22 Request for Additional Information – 02/05/2017
CD3.02A Regulation 22 Request Schedule – 03/05/2017
CD3.03B Junction Assessment (Email from Applicant)
CD3.04A Letter to Aggregate Industries – 14/08/2017
CD3.05A Letter from Advance Environmental – 12/09/2017
CD3.06A Letter to Aggregate Industries – 13/09/2017
CD3.07B Extension of time letter_DCC-3945-2017 – 14/09/2017
CD3.08A Confirmation from Applicant for extension of determination date to 30/11/2017 – 19/09/2017
CD3.09B Extension of time letter accept January 2018 – 30/11/2017
CD3.10A Agreement to extension of time – 10/01/2018
CD3.11B Extension of time letter accept April 2018 – 15/01/2018
CD3.12B Extension of time letter accept August 2018 – 13/04/2018
CD3.13A Agreement to extension of time to 31 December 2018 – 17/07/2018
CD3.14B Extension of time letter accept December 2018 – 17/07/2018
CD3.15A Agreement to extension of time to 31 March 2019 – 12/11/2018
CD3.16B Extension of time letter accept March 2019 – 30/11/2018
CD3.17A Agreement to extension of time to 28th June 2019 – 07/03/2019
CD3.18A Agreement to extension of time to 31st December 2019 – 18/06/2019
CD3.19B Extension of time letter accept December 2019 – 18/06/2019
CD3.20A Agreement to extension of time to 31st March 2020 – 16/12/2019
CD3.21B Extension of time letter accept March 2020 – 16/12/2019
CD3.22A Agreement to extension of time to 31st October 2020 – 27/03/2020
CD3.23A Agreement to extension of time to 31st October 2020 – 27/03/2020
CD3.24B Extension of time letter accept 31 October 2021 – 27/03/2020
CD3.25A Agreement to extension of time to 31st March 2021 – 20/10/2020
CD3.26B Extension of time letter accept 31 March 2021 – 20/10/2020
CD3.27B Change of Description Letter to Applicant – 11/03/2021
CD3.28B Change of Description Letter Agreed – 11/03/2021
CD3.29A Letter from Aggregate Industries re. Further Information – 07/04/2021
CD3.30A Agreement to extension of time to 30th September 2021 – 11/03/2021
CD3.32A Technical Note following meeting with the Environment Agency – 30/06/2021
CD3.33A Agreement to extension of time to 30th November 2021 – 22/09/2021
CD3.34B Extension of Time (Agent) – 05/10/2021
CD4 Regulation 22 Submission
CD4.01A Regulation 22 Response: Introduction
CD4.02A Introduction – Appendix SF1-1: Request for Further Information
CD4.04A Chapter 1 – Highways (Appendix SF-1-1 Road Safety Audit)
CD4.05A Chapter 1 – Highways (Appendix SF1-2 TA Hazardous Cattle Crossing)
CD4.06A 2. Transport – Cross Sections through A30 – SF HWYS/1
CD4.07A Chapter 2 – Hydrogeology and Drainage
CD4.08A Chapter 2 – Figure 2.2
CD4.09A Chapter 2 – Figure 2.3
CD4.10A Chapter 2 – Figure 2.4
CD4.11A Chapter 2 – Appendix A: Regulation 22 Request
CD4.12A Chapter 2 – Appendix B: Minutes of Meeting with Environment Agency
CD4.13A Chapter 2 – Appendix C: Development Proposal
CD4.14A Chapter 2 – Appendix D: Technical Note – Further Clarification of Hydrogeological Model
CD4.15A Chapter 2 – Appendix E: Water Level Responses and Infiltration Tests
CD4.16A Chapter 2 – Appendix F: Infiltration Tests
CD4.17A Chapter 2 – Appendix H: Note of Telephone Conversation with DCC
CD4.18A Chapter 2 – Appendix I: On Site Equipment
CD4.19A Chapter 2 – Appendix G1 – Access Road Swale Calculations
CD4.20A Chapter 2 – Appendix G2 – Ancillary Area Pond Calculations
CD4.21A Chapter 2 – Appendix G3 Fig A2.1 – Phase 1 Operations
CD4.22A Chapter 2 – Appendix G4 Fig A2.2 – Phase 2 Operations
CD4.23A Chapter 2 – Appendix G5 Fig A2.3 – Phase 3 Operations
CD4.24A Hydrology Collation of post Regulation 22 Discussions and Clarifications
CD4.25A Chapter 3 – Additional Landscape & Restoration Issues
CD4.26A Chapter 3 – Landscape Soils and Arboricultural Report
CD4.27A Chapter 3 – Landscape R22L3-1-001 & 002 (Viewpoint M)
CD4.28A Chapter 3 – Fig SF/5-8; 17&18 Rev A (Viewpoints A & G)
CD4.30A Chapter 4 – Ecology – Appendix SF4-1 Straitgate Farm Management Plan
CD4.31A 4. Ecology – Impacts Overview – REG22/ECO/1
CD4.32A 4. Ecology – Straitgate Clarification of Matters set out in Reg 22 Report
CD4.33A 4. Ecology – Straitgate Farm Bat Survey Revision 01
CD4.34A 4. Ecology – Straitgate Farm Bats & Trees: Climb and Inspect Report Revision 00
CD4.35A 4. Ecology – Biodiversity Impact Assessment Plan – Drawing 1
CD4.36A Chapter 5 – Explanatory Note re. Additional Information
CD4.37A Chapter 6 – Restoration and Public Rights of Way
CD4.39A Chapter 7 – Appendix SF 7-2 (Swept Path Junction Improvement)
CD4.40A Chapter 8 – Sustainable Development
CD4.41A Additional Clarification for Maria Walford, Technical Specialist, Environment Agency
CD4.42A Supplementary – Land Ownership Plan
CD4.43A Straitgate Landholding
CD4.44A Supporting Information dated 05/03/2021
CD4.48A Straitgate Cottage and Barn Bat and Breeding Bird Survey Revision 01
CD4.49A Phase 1 Habitat Plan Drawing 1
CD4.50A Straitgate Ecology Update Walkover Check
CD4.51A Straitgate Update Biodiversity Impact Assessment Calculations
CD4.52A Straitgate Biodiversity Metric January 2021
CD4.53A Transport Assessment Revision E
CD4.54A Junction Improvement Longsection & Proposed Construction Depths – 0308.104
CD4.55A Road Section A-B – SF/RS/XX
CD4.56A Road Section C-D – SF/RS/XX
CD4.57A Soils Management Scheme
CD4.58A Appendix A Soil Resources and Agricultural Use & Quality of Land
CD4.59A Overview Plan – R22/L/3-3-001 Rev B
CD4.60A Detail Area – R22/L/3-3-002
CD4.61A Detail Area – R22-L-3-3-003_REV_A_MBJ
CD4.62A Detail Area – R22/L/3-3-004
CD4.63A Detail Area – R22/L/3-3-005
CD4.64A Detail Area – R22/L/3-3-006 Rev A
CD4.65A Detail Area – R22/L/3-3-007 Rev A
CD4.66A Detail Area – R22/L/3-3-008 Rev A
CD4.67A Extraction and Ancillary Development – SF/2 Rev B
CD4.68A Advanced Planting Plan – SF/3 Rev C
CD4.69A Development Phase 1 – SF/5-1 Rev B
CD4.70A Development Phase 2 – SF/5-1Revision C
CD4.71A Development Phase 2 – SF/5-2 Rev B
CD4.72A Development Phase 3 – SF/5-3 Rev B
CD4.73A Cross Sections – SF/5-4 Rev B
CD4.74A Restoration Scheme – SF/6 Rev E
CD4.75A Cross Sections R22/L/3-3-009 Rev A
CD4.76A Cross Sections R22/L/3-3-010 Rev A
CD4.77A Letter from Advance Environmental Responding to Public Health England
CD4.78A Straitgate Quarry (Prospect) Resource Assessment
CD4.79A Greenhouse Gas Assessment of the Proposed Quarry at Straitgate Farm
CD4.80B Information relating to DCC/3944/2017 (Straitgate)
CD4.81B Environmental Information
CD4.82B Clay Lane Planting Plan (Hillhead)
CD4.83B Clay Lane Proposed Mitigation Planting (Hillhead)
CD4.84 Archaeology And Cultural Heritage 12
CD4 Regulation 22 Submission Dated September 2022
CD4.85 Regulation 22 Request Response Summary
CD4.86 Appendix 1 – Arboricultural Impact Assessment (Hillhead)
CD4.87 Appendix 2 – Chapter 10 (Noise) AECL Regulation 22 Response
CD4.88 Appendix 3 – Chapter 11 (Dust and Air Quality) AECL Regulation 22 Response
CD4.89 Appendix 4 – Chapter 9 (Transport) Horizon Consulting Regulation 22 Response
CD4.90 Appendix 5 – DCC Letter and AIUK Response Letter 11th March 2021
CD4.91 Appendix 6 – Revised Non-Technical Summary
CD5 Regulation 22 Statutory Consultation Responses
CD5.01A DCC Landscape Response 18/08/2017
CD5.02B Natural England Response – 18/08/2017
CD5.03A East Devon CPRE Response – 22/08/2017
CD5.04B Historic England Response – 24/08/2017
CD5.05B Public Health England Response – 24/08/2017
CD5.06A Natural England Response – 01/09/2017
CD5.07A Environment Agency Response – 01/09/2017
CD5.08A West Hill Parish Council Response – 15/09/2017
CD5.09B Mid Devon District Council Response – 16/10/2017
CD6 Additional Comments and Documents
CD6.01A Transport Assessment – D. Mason – 12/04/2017
CD6.02A Public Health England Response – 25/09/2017
CD6.03A Environment Agency Response – 09/10/2017
CD6.04A Junction Improvement Scheme Letter and Layout Plan – 0303.101 Rev F – 20/10/2017
CD6.05A Environment Agency Response – 23/02/2018
CD6.06A Devon Gardens Trust Response – 30/04/2018
CD6.07A Public Health England Response to Representation – 31/05/2018
CD6.08A Devon Gardens Trust – 01/06/2019
CD6.09A Environment Agency Response – 30/09/2019
CD6.10A Environment Agency Response – 31/01/2020
CD6.11A Public Health England Response – 14/04/2021
CD6.12A Exeter and Devon Airport Ltd Response – 17/04/2021
CD6.13A West Hill Parish Council Response – 27/04/2021
CD6.14A Devon Gardens Trust Response – 28/04/2021
CD6.15A Response from Councillor Wright – 03/05/2021
CD6.16A EDDC Environmental Health Response -11/05/2021
CD6.17A Highways England Response – 11/05/2021
CD6.18A Highways England attachment – Response dated 09/08/2017 – 11/05/2021
CD6.19A Highways England attachment – Response to application 20/2542/FUL – 11/05/2021
CD6.20A Highways England attachment – Cross Sections through A30 – SF HWYS/10 – 11/05/2021
CD6.21A Response from Councillor Bailey – 15/05/2021
CD6.22A Natural England Response – 17/05/2021
CD6.23A East Devon AONB Partnership Response – 20/05/2021
CD6.24A DCC Flood Risk Response – 20/05/2021
CD6.25A East Devon District Council Response – 30/06/2021
CD6.26A East Devon District Council Response – 14/07/2021
CD6.27A EDDC Environmental Health (Private Sector Housing) Response – 05/08/2021
CD6.28A Devon Gardens Trust Response – 08/08/2021
CD6.29A DCC Ecology Response – 12/08/2021
CD6.30A Environment Agency Response – 13/08/2021
CD6.31A DCC Flood Risk Response – 07/09/2021
CD6.32A West Hill Parish Council Response – 08/10/2021
CD6.33A DCC Highways Response – 02/11/2021
CD6.34A DCC Flood Risk Briefing Note to Support the Removal of Objection – 18/11/2021
CD6.35A EDDC Private Sector Housing & Private Water Supplies Email – 26/11/2021
CD6.36 Appeal Note – Landbank – 20/07/2022
CD6.37 Dec 1990 Report on reserves of Pebble Beds at Straitgate Farm
CD6.38 Dec1990 Report on reserves of Pebble Beds at Straitgate Farm Appendix
CD6.39 202542FUL Livestock crossing over B3174 Supporting Statement
CD6.40 202542FUL Livestock crossing over B3174 Approval Certificate with Conditions
CD6.41 Minerals Survey 2020 Hillhead Quarry
CD6.42 Straitgate Farm Geological Plan September 2011
CD6.43 Hughes Drilling. (2012). Bore Hole Logs Piezometers 1 to 6
CD6.44 Bardon Aggregates. (2012). GRADATION ANALYSIS TEST REPORT
CD6.45 Environment Agency (2016) letter to DCC 23rd September 2016
CD6.46 Environment Agency (2013) SPZ delineation report for Cadhay former estate
CD6.49 Brassington, R. (2020). Report on the hydrogeology at Straitgate Farm for DCC, Ref. 1929
CD6.51 Representation by Foot Anstey on behalf of Mr Taylor 492017 including Vectos Report
CD6.52 High specification aggregates for road surfacing materials in England
CD6.53 DCC37742015 ALTERNATIVES CH5 ES
CD6.54 DCC37742015 ALTERNATIVES CH8 ES
CD6.55 Girling v East Suffolk Judgment 1.10.2020
CD6.56 Third Party Comment newt ponds 19.04.21
CD6.57 DCC letter to agent re Clay Lane
CD6.58 Agent response to DCC re Clay Lane
CD6.59 Minutes of 26-07-2021 Broadpath & Hillhead Liaison Group Meeting
CD6.60 Minutes of 07-03-2022 Broadpath & Hillhead Liaison Group Meeting
CD6.61 Aggregate Industries Pre Read Broadpath Liaison July 2022
CD6.63 Bearcock & Smeadley 2012 baseline chemistry
CD6.64 Chilton & Foster 1990 control of nitrate
CD6.66 Environment Agency 2007 Hydrogeological Impact Appraisal
CD6.67 Environment Agency 2008 Continuous Estimation of River Flows
CD6.68 Environment Agency 2018 approach to groundwater protection
CD6.69 Freeze & Cherry 1979 Groundwater
CD6.70 Lee & Chen 2006 Estimation of Groundwater Recharge Using Water Balance
CD6.71 Ronen & Sorek 2005 The unsaturated zone a neglected component of nature
CD6.72 Rosenberry et al 2008 Use of monitoring wells
CD6.73 Shen, Pennell, & Suuberg, 2013 influence of soil moisture on soil gas vapor
CD6.74 WHO 2007 pH in Drinking Water
CD7 Decision
CD7.01A Committee Report – Straitgate Farm
CD7.01B Committee Report – Hillhead Quarry
CD7.01.1 Committee Report – Supplement Update
CD8 Policy Documents
CD8.01 National Planning Policy Framework
CD8.02 Devon County Minerals Local Plan (2004) Part A
CD8.02.1 Devon County Minerals Local Plan (2004) Part B Inset Plans
CD8.03 Devon Minerals Plan (2017)
CD8.04 East Devon Local Plan 2013-2031 (2016)
CD8.05 Otter St Mary and West Hill Neighbourhood Plan (2018)
CD8.06 The 10th Devon Local Aggregates Assessment 2011-2020
CD8.07 Mid Devon Local Plan 2013-2033 (2020)
CD8.08 Devon Minerals Core Strategy: Issues & Options Consultation Paper (2007)
CD8.09 Devon Minerals Core Strategy: Report of Call for Aggregates Sites (2010)
CD8.10 Devon Minerals Core Strategy Options Consultation Paper (2011)
CD8.11 Devon Minerals Plan Summary of Site Appraisal Findings (2012)
CD8.12 Devon Minerals Plan Pre-submission Consultation (2015)
CD8.13 Devon Minerals Plan Inspector’s Report (2016)
CD8.15 Ancient and other veteran trees (2013) (Lonsdale ed) Fig 2.8 Girth-Age
CD8.16 Planners Manual for Ancient Woodland
CD8.17 East Devon Landscape Character Assessment (2019)
CD8.18 OPDM Circular 2005-6 Biodiversity and Geological Conservation
CD8.19 British Standard 42020.2013 – Biodiversity Code of Practice
CD8.20 Advice-Note Lifespan of Ecological Reports and Surveys
CD8.21 Bat Conservation Trust Guidelines – Age of Survey Data
CD8.22 WML-G24 EPS Licensing and the Three Tests March 2011
CD8.23 The Setting of Heritage Assets – Historic England
CD8.25 Straitgate Farmhouse Listing Description
CD8.26 Cadhay Registered Park and Garden Listing Description
CD8.28 Devon Minerals Plan Policies Map
CD9 Appeal Documents
CD9.01 Start Date Letter – 21 Jun 2022
CD9.02 Rule 6 Party – REQUEST FOR RULE 6 STATUS.pdf – 804811
CD9.03 Rule 6 Party – 24 Jun 2022
CD9.05 Additional Document -Questionnaire – Report on a proposed sand and gravel quarry
CD9.07 Statement of Case (Devon County Council)
CD9.08 Statement of Case (Rule 6 Party) (22.07.2022)
CD9.09 Statement of Case (Appellant)
CD9.10 Regulation 22 request_3299799 and 3299802
CD9.12 Straitgate Farm Letter 22 August 2022
CD9.13 Straitgate Farm Quarry – Appellant’s CMC Note
CD9.14 Straitgate Farm and Hillhead Inquiries – MPA CMC Note – 23 August 2022
CD9.16 Hopkins Developments Ltd v Secretary of State for Communities and Local Government
CD9.17 Case Management Conference Summary
CD9.18 Appellant Response to MPA Note 31 August
CD9.19 Hydrogeological Statement of Common Ground (Redacted)
CD9.20 Statement of Common Ground (Redacted)
CD9.21 Planning Rebuttal with appendices
CD9.26 Appendix_4_and_5_footpath routes
CD9.28 CIL Compliance Statement
CD9.29 Draft Inquiry Programme
CD9.30 Draft Agenda – Heritage
CD9.31 Draft Agenda – Highways and Farm Management
CD9.32 Draft Agenda – Hydrogeology
CD9.33 Draft Agenda – Ecology Trees and Hedgerows
CD9.34 Draft Agenda – Flood Risk and Drainage
CD9.36 MPA Opening Submissions.pdf
CD9.37 SAG Opening Submissions .pdf
CD9.38 Appellant Opening Submissions
CD9.39 Appellant Inquiry Note – groundwater storage. JHRK03.10.22
CD9.40 2014 Memorandum of Understanding.pdf
CD9.41 2015 Memorandum of Understanding.pdf
CD9.42 Mineral Products Association – Mind The Gap .pdf
CD9.43 Straitgate Inquiry note – BSPB character.pdf
CD9.44 Decision Notice DCC-4067-2018 (Clay Lane)
CD9.45 rev B – Scheme Layout DCC-4067-2018 (Clay Lane)
CD9.46 rev E – Scheme Layout DCC-4067-2018 (Clay Lane)
CD9.47 Site Location Plan DCC-4067-2018 (Clay Lane)
CD9.48 Site Plan DCC-4067-2018 (Clay Lane)
CD9.49 Planting Plan DCC-4067-2018 (Clay Lane)
CD9.50 MPA Response Dr Heathcote Note
CD9.51 Draft Inquiry Programme version 2
CD9.53 CM Ref 11 Abstract Muniz 1991 Freshwater acidification_ its effects on communities
CD9.54 CM Ref 12 Abstract Jackson et al 1990 Effects of Neutralization and Early Acidification
CD9.55 CM Ref 13 Abstract Brodin Y W 1995 Acidification of Swedish freshwaters _ SpringerLink
CD9.56 CM Ref 14 Abstract Schindler and Turner 1982 Experimental Acidification
CD9.57 CM Ref 15 Coping with algae in ponds
CD9.58 CM Ref 16 Ponds with fluctuating water levels_Suffok Wildlife Trust
CD10 Interested Party Representations
CD10.01 Interested Party – Julie Anne Crook 14-07-2022
CD10.02.1 Interested Party – Simon Jupp 12-07-2022
CD10.02.2 Interested Party – Simon Jupp Attachment 12-07-2022
CD10.03 Interested Party – Mr & Mrs Davis 21-07-2022
CD10.04 Interested Party – Mr & Mrs Welch 22-07-2022
CD10.05 Interested Party – Mrs And Mr B Shepherd 05-07-2022
CD10.06 Interested Party – Mrs Sarah Rice 15-07-2022
CD10.07.1 Interested Party – National Highways (Straitgate) 29-06-2022
CD10.07.2 Interested Party Attachment – National Highways (Straitgate) Attachment Plan
CD10.07.6 Interested Party – National Highways (Hillhead) 29-06-2022
CD10.08 Interested Party Attachment – National Highways (Hillhead) 21-03-2017 Application Response
CD10.09 Interested Party – West Hill Parish Council 20-07-2022
CD10.09.2 Interested Party Attachment 1 of 2 – West Hill Parish Council 20-07-2022
CD10.09.3 Interested Party Attachment 2 of 2 – West Hill Parish Council 20-07-2022
CD10.10 Interested Party – Mr Martin Rice 21-07-2022
CD10.11 Interested Party – Mr Robert Heeley 24-07-2022
CD10.12 Interested Party – A.G Wotton 19-07-2022
CD10.13 Interested Party – A M Crook 14072022
CD10.14 Interested Party – Anne And Graham Carter 20-07-2022
CD10.15.1 Interested Party – Cllr Jess Bailey 26-07-2022
CD10.15.2 Interested Party Attachment – Cllr Jess Bailey 26-07-2022
CD10.16.1 Interested Party – Mrs Jane Bushby 25-07-2022
CD10.16.2 Interested Party Attachment – Mrs Jane Bushby 25-07-2022
CD10.17.1 Interested Party (Email) – Devon Gardens Trust 25-07-2022
CD10.17.2 Interested Party Attachment – Devon Gardens Trust 25-07-2022
CD10.18.1 Interested Party – Environment Agency Covering Letter 25-07-2022
CD10.18.2 Interested Party – Environment Agency Attachment 25-07-2022