The A30 Honiton to Devonshire Inn scheme public consultation commenced on Wednesday 3 August 2016, and all documents relating to the scheme have now been uploaded to this website. These documents are available through the links below or at Public consultation.
The following documents can now be downloaded:
A30 Honiton to Devonshire Inn Consultation Leaflet
Click here to download the consultation leaflet
Traffic assessment information
Data Collection Report
Local Model Validation Report
Forecasting Report
Economics Report
Environmental information
A30 Environmental Assessment Report
- Text
- EAR Technical Appenidx Front Cover and Contents
- Appendix 4.1 – A30 Location Specific Mitigation Features
- Appendix 4.2 – A30 Potential Environment Enhancement
- Appendix 5.1 & 5.2
- Appendix 5.3 – Construction Dust Assessment Criteria
- Appendix 6.1 – Cultural Heritage
- Appendix 6.2 – Cultural Heritage Figures
- EAR Technical Appendix 7A – Extracts from Published LCVA (1-10)
- EAR Technical Appendix 7A – Extracts from Published LCVA (11-20)
- EAR Technical Appendix 7A – Extracts from Published LCVA (21-30)
- EAR Technical Appendix 7A – Extracts from Published LCVA (31-40)
- EAR Technical Appendix 7A – Extracts from Published LCVA (41-54)
- EAR Technical Appendix 7A – B – Baseline Detailed Methodology
- EAR Technical Appendix 7A – C – NPA Local LCA Field Survey Record
- EAR Technical Appendix 7A – D – Records of Stakeholder Consultation
- EAR Technical Appendix 7A – E Mitigation Enhancement Oppurtunities
- EAR Technical Appendix 7A – Vol 2 Figures July 2016 5D
- EAR Technical Appendix 7A – Vol 2 Figures July 2016 6D – 7C
- EAR Technical Appendix 7A – Vol 2 Figures July 2016 7D – 8J
- EAR Technical Appendix 7A – Vol 2 Figures July 2016 8K – 8V
- EAR Technical Appendix 7A – Vol 2 Figures July 2016 8W – 8ZI
- EAR Technical Appendix 7A – Vol 2 Figures July 2016 8ZJ – 8ZT
- EAR Technical Appendix 7A – Vol 2 Figures July 2016 8ZU – 10b
- Appendix 7B – NPA Detailed LVIA Methodology
- Appendix 7C – Landscape and Visual Assessment Summary Tables July 2016
- Route Options – Figure 10
- Appendix 11.1 – Noise Assessment Study Area
- Appendix 11.2 – Traffic Noise Contours 2025 DM to 2025 DS Blue Route
- Appendix 11.3 – Traffic Noise Contours 2025 DM to 2025 DS Orange Route
- Appendix 11.4 – Traffic Noise Contours 2025 DM to 2040 DS Blue Route
- Appendix 11.5 – Traffic Noise Contours 2025 DM to 2040 DS Orange Route
- Appendix 12 – People and Communities
- Appendix 13.1 – Hydrology Baseline Mapping Figure 13-1
- Appendix 13.2 – Aquifers & SPZ – Figure 13-2
- Appendix 13.3 – Summary of Consultation Responses Information Obtained
- Appendix 13.4 – Water Receptors Affected
General summary and appraisal of the scheme
- Value Management Briefing (1)
- Value Management Briefing (2A)
- Value Management Workshop Report (1)
- Value Management Workshop Report (2A)
Draft Technical Appraisal Report
- Volume 1 (text)
- Volume 2 (Figures 1-4)
- Volume 2 (Figures 5-7)
- Volume 2 (Figures 8-9B)
- Volume 2 (Figures 9C-10)
- Volume 2 (annexes 11-13)
- Volume 2 (annex 14)
Scheme plans
Share your views
This consultation is being held between 3 August and 30 September 2016. It is your opportunity to express your views on the scheme proposals. To share your views and comments on the proposed improvement please complete the online questionnaire at surveys.devon.gov.uk/s/A30Consultation or pick up a printed copy at one of our upcoming exhibitions:
16 August:
Monkton Court Hotel 12pm-8pm
20 August:
Mackarness Hall, Honiton 10am-6pm
10 September:
Upottery Village Hall 10am-6pm