Cabinet
Cabinet – Wednesday 14 December 2016 – 10.30am
- Agenda Reports Pack – See Agenda Item 9 for A30 Improvement Scheme Report
- Link to full Cabinet agenda for Wednesday 14 December
- A30 Honiton to Devonshire Inn Impact Assessment
- Route plan of the proposed preferred option (modified orange route) and print-friendly route plan. The ‘modified orange route’ includes amendments following feedback from public consultation.
Updates
Environmental Assessment Report
Following public consultation between August and September 2016, the Environmental Assessed Report (EAR) was updated to include new data from environmental surveys or new information emerging as a result of the public consultation.
The EAR considers the environmental effect of the Blue and Orange routes as presented at the public consultation between August and September 2016.
The associated scheme plans can be found below:
- Environmental Assessment Report – Text (Revised Draft December 2016)
- Environmental Assessment Report – Technical Appendices – Content
The following document introduces the various Technical Appendices of the Environmental Assessment Report and show whether they have been revised since published during the public consultation in August 2016:
- Introduction to EAR and TAR (December 2016)
- A30 Introduction to Technical Appendices (December 2016)
- Appendix 1 – A30 Environmental Scoping Report
- Appendix 4.1 – Location Specific Mitigation Features (August 2016)
- Appendix 4.2 – Potential Environmental Enhancement (August 2016)
- Appendix 5.1 & 5.2 – Baseline Model Results & Modelled Pollutant Concentrations (August 2016)
- Appendix 5.3 – Construction Dust Assessment Criteria (August 2016)
- Appendix 6.1 – Historic Environment – Desk Based Assessment (August 2016)
- Appendix 6.2 – Cultural Heritage Figures (August 2016)
- Appendix 7A – Landscape and Visual Baseline Report (April 2016)
- Appendix 7A – Landscape and Visual Baseline Figures – Volume 2 (July 2016)
- Appendix 7A – A – Extracts from Published LCVA – 1-10 (August 2016)
- Appendix 7A – A – Extracts from Published LCVA – 11-20 (August 2016)
- Appendix 7A – A – Extracts from Published LCVA – 21-30 (August 2016)
- Appendix 7A – A – Extracts from Published LCVA – 31-40 (August 2016)
- Appendix 7A – A – Extracts from Published LCVA – 41-54 (August 2016)
- Appendix 7A – B – Baseline Detailed Methodology (July 2016)
- Appendix 7A – C – Local LCA Field Survey Record Sheets (July 2016)
- Appendix 7A – D – Records of Stakeholder Consultation (July 2016)
- Appendix 7A – E – Mitigation – Enhancement Opportunities (July 2016)
- Appendix 7B – Detailed LVIA Methodology (July 2016)
- Appendix 7C – Landscape and Visual Assessment Summary Tables (July 2016)
- Addendum to the Appendices of Chapter 7 (December 2016)
- Appendix 8.1 – Extended Phase 1 Habitat Survey (December 2016)
- Appendix 8.2 – Preliminary Bat Roost Survey (December 2016)
- Appendix 8.3 – Static Bat Detector Survey Report (December 2016)
- Appendix 8.4 – EAR Summary Map of Key Ecological Features (December 2016)
- Appendix 11.1 – Noise Assessment Study Area (December 2016)
- Appendix 11.2 – Traffic Noise Contours – 2025 DM to 2025 DS – Blue Route (December 2016)
- Appendix 11.3 – Traffic Noise Contours – 2025 DM to 2025 DS – Orange Route (December 2016)
- Appendix 11.4 – Traffic Noise Contours – 2025 DM to 2040 DS – Blue Route (December 2016)
- Appendix 11.5 – Traffic Noise Contours – 2025 DM to 2040 DS – Orange Route (December 2016)
- Appendix 12 – People & Communities (December 2016)
- Appendix 13.1 – Hydrology – Baseline Mapping – Figure 13.1 (August 2016)
- Appendix 13.2 – Aquifers & SPZ – Figure 13.2 (August 2016)
- Appendix 13.3 – Summary of Consultation Responses and Information Obtained (August 2016)
- Appendix 13.4 – Water Receptors Affected (August 2016)
Assessment of Implications on European Sites
Technical Appraisal Report
- Technical Appraisal Report – Text
- Volume 2 – Figures 1-4
- Volume 2 – Figures 5-7
- Volume 2 – Figures 8-9B
- Volume 2 – Figures 9C – 10
- Annexes 11 – 13
- Annex 14
Traffic and Economics
Outcome
Public Consultation Report
- Public Consultation Report – Text
- Public Consultation Report – Appendix 1-2
- Public Consultation Report – Appendix 3-4
- Public Consultation Report – Appendix 5
- Public Consultation Report – Appendix 6-7
- Public Consultation Report – Appendix 8-9
- Public Consultation Report – Appendix 10-17