What we are doing

We are carrying out carriageway resurfacing and drainage work on A375 Sidmouth along Temple Street, Vicarage Road, including High Street and Fore Street, as it has reached the end of its serviceable life.

Repairs will be made to utility covers and gullies as required and parts of the drainage system will be replaced. We will be carrying out maintenance of the highway signs and road markings will be reinstated once the new road surface is completed.

We will be using two types of traffic management to carry out the work safely either at night or during the day within the time frame for the scheme:

  • Road closures with diversions.
  • Temporary traffic lights to maintain one lane open for use.

When we are closing the road

This work will take place between 10 January 2022 and 1 April 2022. To minimise disruption, work will be carried out by closing sections of the road at a time.

In order to provide you with advance notice of the road closures and areas of parking restrictions, we have divided the scheme for road closures and diversion routes described below. These areas will be further subdivided in order to carry out the work in smaller sections.

Temple Gardens to All Saints Road

Work on Temple Street and Vicarage Road will be carried out at different times of the day. More information about the diversion route is available at one.network.

  • Salcombe Road to All Saints Road roundabout

    The road from Salcombe Road Junction to All Saints Road, including the roundabout, will be closed from 12 January 2022 until 30 January 2022. All drainage work will be carried out during the day and surfacing operations will be completed at night in this area.

    A map image illustrating a road closure between Salcombe Road and All Saints Road in Sidmouth

  • Temple Gardens to Brewery Lane (part 1)

    The road from Temple Gardens to Peasland Road will be closed from 10 February 2022 until 11 February 2022 and from 14 March 2022 until 21 March 2022.

    The drainage work will be completed in February and the surfacing will be carried out in March. Both operations will be carried out during the day.

    A map image illustrating a road closure between temple gardens and brewery lane in Sidmouth

  • Brewery Lane to All Saints Road roundabout (part 1)

    The road from Brewery Lane to The Grove will be closed from 16 February 2022 until 21 February 2022 and 22 March 2022 until 24 March 2022 and for one day on 29 March 2022.

    The drainage work will be completed in February and the surfacing will be carried out in March, both operations will be carried out during the day. We will commence work at the north end and work towards the south.

    A map image illustrating a road closure between Brewery Lane and All Saints Road in Sidmouth

  • Brewery Lane to All Saints Road roundabout (part 2)

    The road from the Grove to Victoria Road will be closed from 21 February 2022 until 28 February 2022 and from 25 March 2022 until 28 March 2022.

    The drainage work will be completed in February and the surfacing will be carried out in March, both operations will be carried out during the day. We will start work at the north end and work towards the south.

    A map image illustrating a road closure between Salcombe Road and All Saints Road in Sidmouth

  • Temple Gardens to Brewery Lane (part 2)

    The road from Peasland Road to Brewery Lane will be closed from 14 February 2022 until 16 February 2022 and from 16 March 2022 until 21 March 2022.

    The drainage work will be completed in February and the surfacing will be carried out in March and both operations will be carried out during the day.

    A map image illustrating a road closure between Temple Gardens and Brewery Lane in Sidmouth

  • Brewery Lane to All Saints Road roundabout (part 3)

    The road from Victoria Road to Salcombe Road will be closed from 28 February 2022 until 3 March 2022, 1 March until 3 March 2022 and 29 March 2022 until 1 April 2022.

    The drainage work will be completed in the first set of closures and the surfacing will be carried out in March and both operations will be carried out during the day. We will start work at the north end and work towards the south.

    A map image illustrating a road closure between Brewery Lane and All Saints Road in Sidmouth

  • All Saints Road to Esplanade

    We will close Fore Street and High Street from 5.30 pm until 7.00 am at night but may use traffic lights during the day for drainage work. More information is available on the diversion route that can be seen at one.network.

  • All Saints Road roundabout to Russell Street (part 1)

    The road south of All Saints Road to the Woodberry House (Holmdale) junction will be closed from 18 January 2022 until 31 January 2022.

    All drainage work will be carried out during the day and surfacing operations will be completed at night in this area.

    A map image illustrating a road closure between All Saints Road and Russel Street in Sidmouth

  • Russell Street to Esplanade (part 1)

    The road from Old Fore Street/Russell Street to New Street will be closed from 31 January 2022 until 3 February 2022 and from 4 March 2022 until 11 March 2022.

    We will start work at the north end and work towards the Esplanade, completing part 1 before starting work on part 2. This is to allow free access as soon as possible for residents.

    The early work involves drainage repairs and the work in March will be the surfacing of the highway.

    A map image illustrating a road closure between Russell Street and the Esplanade in Sidmouth

  • All Saints Road roundabout to Russell Street (part 2)

    The road from Woodberry House (Holmdale) to the Old Fore Street/Russell Street junction will be closed from 3 March 2022 until 11 March 2022 for the surfacing operations to be completed at night.

    It will also be closed on 31 January 2022 to allow completion of drainage work which are following on from the work to the north of Woodberry House (All Saints Road roundabout to Russell Street part 1).

    A map image illustrating a road closure between All Saints Road and Russell Street in Sidmouth

  • Russell Street to Esplanade (part 2)

    New Street to the Esplanade will be closed from 3 February 2022 until 10 February 2022 and from 4 March 2022 until 11 March 2022.

    We plan to carry out all drainage work during the day and surfacing operations will be completed at night in this area.

    A map image illustrating a road closure between Russell Street and the Esplanade in Sidmouth

Traffic management

Traffic management is needed due to the extent of the work being undertaken on the road and for the safety of the workforce. The majority of the work will be done under road closures.

Where work can be carried out safely using temporary traffic lights, these will be used in order to minimise delay and disruption to the travelling public.

Advance signage will notify of future closures.

How local traffic is being handled

Traffic will be signed to use the diversion routes which will be in operation. Access will always be maintained for emergency vehicles.

We will work during the day to minimise noise disruption to residents and try to maintain access for residents where possible. We may have to restrict access during certain periods, but we will try to minimise this and provide advance notice to the public.

Three gate person will be available at each closure to help any questions and deal with any access issues.

Why is there such a long diversion route?

We are obliged to sign diversions that use roads of the same classification to the road that is temporarily closed. This is especially important for HGV and drivers of larger vehicles.

Local drivers may choose to use their local knowledge to identify alternative, appropriate, and possibly shorter, routes.