The standard treatment time is 3hrs, although some routes are completed in a much shorter time.
The gritter drivers are instructed to drive with due care and attention. The maximum speed when salting is 45 mph, conditions permitting.
Posted on 25 January 2017
The standard treatment time is 3hrs, although some routes are completed in a much shorter time.
The gritter drivers are instructed to drive with due care and attention. The maximum speed when salting is 45 mph, conditions permitting.