{"id":7,"date":"2021-06-09T12:03:49","date_gmt":"2021-06-09T11:03:49","guid":{"rendered":"https:\/\/www.devon.gov.uk\/marsh-barton-railway-station\/?page_id=7"},"modified":"2023-06-23T09:45:51","modified_gmt":"2023-06-23T08:45:51","slug":"schedule","status":"publish","type":"page","link":"https:\/\/www.devon.gov.uk\/marsh-barton-railway-station\/schedule\/","title":{"rendered":"Schedule"},"content":{"rendered":"<p>Work started in spring 2021 and is due to be completed in spring 2023. The following schedule is subject to change:<\/p>\n<div class=\"table-scroll\"><table>\n<thead>\n<tr>\n<th scope=\"col\">Date<\/th>\n<th scope=\"col\">Work\u00a0starting<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"width: 225.92px\"><span data-contrast=\"auto\">Spring 2021<\/td>\n<td style=\"width: 1030.12px\"><span data-contrast=\"auto\">Enabling works, site preparation and mobilisation<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 225.92px\"><span data-contrast=\"auto\">Summer 2021<\/td>\n<td style=\"width: 1030.12px\">\n<p><span data-contrast=\"auto\">Signalling<\/p>\n<p><span data-contrast=\"auto\">Platform substructures &#8211; includes excavation of the foundations, piling and forming the concrete bases.<br \/>\n<\/p>\n<p><span data-contrast=\"auto\">Bridge foundations<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 225.92px\"><span data-contrast=\"auto\">Autumn 2021<\/td>\n<td style=\"width: 1030.12px\">\n<p><span data-contrast=\"auto\">Platform superstructures &#8211; includes installation of platform cantilever beams, precast slabs, platform coping and litter guards.<\/p>\n<p><span data-contrast=\"auto\">Approach ramps &#8211; includes stabilisation of the existing embankment, construction of retaining wall to build up the new ramps, as well as laying kerbs, surfacing material and handrails.<br \/>\n<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 225.92px\"><span data-contrast=\"auto\">Winter 2021<\/td>\n<td style=\"width: 1030.12px\">\n<p><span data-contrast=\"auto\">Footbridge installation<\/p>\n<p><span data-contrast=\"auto\">Platform finishes<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 225.92px\"><span data-contrast=\"auto\">Spring 2022<\/td>\n<td style=\"width: 1030.12px\"><span data-contrast=\"auto\">Platform accesses\u00a0<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 225.92px\"><span data-contrast=\"auto\">Summer 2022<\/td>\n<td style=\"width: 1030.12px\"><span data-contrast=\"auto\">Mechanical and electrical works<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 225.92px\"><span data-contrast=\"auto\">Autumn 2022 &amp; Winter 2022\/23<\/td>\n<td style=\"width: 1030.12px\"><span data-contrast=\"auto\">Access and approach ramp finishes along with testing and commissioning<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 225.92px\"><span data-contrast=\"auto\">Winter 2022\/23<\/td>\n<td style=\"width: 1030.12px\"><span data-contrast=\"auto\">Construction work complete and bridge opens to public<\/td>\n<\/tr>\n<tr>\n<td style=\"width: 225.92px\"><span data-contrast=\"auto\">Summer 2023<\/td>\n<td style=\"width: 1030.12px\"><span data-contrast=\"auto\">Station opens<br \/>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table><\/div>\n\n","protected":false},"excerpt":{"rendered":"<p>Work started in spring 2021 and is due to be completed in spring 2023. The following schedule is subject to change: Date Work\u00a0starting Spring 2021 Enabling works, site preparation and mobilisation Summer 2021 Signalling Platform substructures &#8211; includes excavation of &hellip; <a href=\"https:\/\/www.devon.gov.uk\/marsh-barton-railway-station\/schedule\/\" aria-label=\"Continue reading Schedule\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":748,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":"","_links_to":"","_links_to_target":""},"class_list":["post-7","page","type-page","status-publish","hentry"],"acf":[],"publishpress_future_action":{"enabled":false,"date":"2026-05-28 20:20:39","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.devon.gov.uk\/marsh-barton-railway-station\/wp-json\/wp\/v2\/pages\/7","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.devon.gov.uk\/marsh-barton-railway-station\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.devon.gov.uk\/marsh-barton-railway-station\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.devon.gov.uk\/marsh-barton-railway-station\/wp-json\/wp\/v2\/users\/748"}],"replies":[{"embeddable":true,"href":"https:\/\/www.devon.gov.uk\/marsh-barton-railway-station\/wp-json\/wp\/v2\/comments?post=7"}],"version-history":[{"count":5,"href":"https:\/\/www.devon.gov.uk\/marsh-barton-railway-station\/wp-json\/wp\/v2\/pages\/7\/revisions"}],"predecessor-version":[{"id":171,"href":"https:\/\/www.devon.gov.uk\/marsh-barton-railway-station\/wp-json\/wp\/v2\/pages\/7\/revisions\/171"}],"wp:attachment":[{"href":"https:\/\/www.devon.gov.uk\/marsh-barton-railway-station\/wp-json\/wp\/v2\/media?parent=7"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}