{"id":2908,"date":"2023-06-06T13:40:21","date_gmt":"2023-06-06T12:40:21","guid":{"rendered":"https:\/\/www.devon.gov.uk\/floodriskmanagement\/?post_type=dcc_docs_document&#038;p=2908"},"modified":"2023-06-06T13:40:29","modified_gmt":"2023-06-06T12:40:29","slug":"summer-2023-newsletter","status":"publish","type":"dcc_docs_document","link":"https:\/\/www.devon.gov.uk\/floodriskmanagement\/document\/summer-2023-newsletter\/","title":{"rendered":"Summer 2023 Newsletter"},"content":{"rendered":"\n\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":2216,"template":"","meta":{"_acf_changed":false,"_links_to":"","_links_to_target":""},"documents_category":[],"class_list":["post-2908","dcc_docs_document","type-dcc_docs_document","status-publish","hentry"],"acf":{"updated":"","dccdocs_documents":null,"section-guidance":"","sections":[{"title":"Devon Local Flood Risk Management Strategy Update","anchor":"devon-local-flood-risk-management-strategy-update","text":"This newsletter is the first instalment for 2023 engaging with our partners and local communities to inform them of the work being undertaken in local flood risk management. A copy of\u00a0<a href=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/local-flood-risk-management-strategy\/?web=1&amp;wdLOR=cE35D1B67-DCCB-4C11-AD04-11FBD415DE1F\">the full Strategy can be found on our website<\/a>.","sub_sections":null},{"title":"Flood Risk Management Working Arrangements","anchor":"flood-risk-management-working-arrangements","text":"Over the past couple of years of hybrid working the Flood &amp; Coastal Risk Management team have established a routine that maintains the high level of service expected, ensuring the risk of flooding to people\u2019s homes and businesses is prioritised and reduced. The majority of the team spend most of their time working from home and go to the office at County Hall when it is appropriate to do so. Communicating directly with the team, either through email or telephone is not affected by these arrangements.\r\n\r\nTeam members can undertake site visits where necessary and are mindful of individual wishes when meeting indoors or sharing vehicles. Most of our meetings continue to take place via video conferencing wherever possible, saving time and money. Safe working practices will continue to be followed to enable us to fulfil our responsibilities as the Lead Local Flood Authority.","sub_sections":null},{"title":"Flood incidents","anchor":"flood-incidents","text":"","sub_sections":[{"title":"9th May Storms","sub-anchor":"9th-may-storms","text":"The recent flood event in Devon on 9th May caused severe disruption and flooding to over 100 properties and major parts of the highway network. This was due to a significant thunderstorm that moved across the County with a very localised high intensity rainfall over the Exeter and East Devon area. The worst affected area included Newton Poppleford, Colaton Raleigh, Tipton St John, Metcombe, Venn Ottery and Harpford.\r\n\r\n[caption id=\"attachment_2932\" align=\"aligncenter\" width=\"480\"]<img class=\"wp-image-2932 size-full\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Newton-Popplefield-Aftermath.png\" alt=\"Image shows mud and debris aftermath from flooding at Newton Poppleford.\" width=\"480\" height=\"270\" \/> Newton Poppleford \u2013 Aftermath of the flooding and start of the clean-up.[\/caption]\r\n\r\nAs the Lead Local Flood Authority it is our duty to produce a Section 19 Flood Investigation Report detailing the source of flooding and the relevant Risk Management Authority who will consider exercising their functions. In the report we will endeavour to give a clear explanation of the event, the scale of disruption and consideration of any immediate or longer-term actions that will help reduce the risk of future flooding. In accordance with our Local Strategy we will aim to publish the findings in the next 3 months, however any \u2018quick-wins\u2019 identified will be carried out by the relevant authority, subject to available funding, and any enforcement requirements will be progressed.\r\n\r\nWe are now continuing to work closely with our partners at the Environment Agency, District and Parish Councils to gather as much detail as possible on the extent of the flood event and assess how many properties have sustained damage from floodwater. We are also engaging directly with the affected residents through local drop-in surgeries giving them the opportunity to share their experiences of the flooding. Such events have been held at Newton Poppleford and Colaton Raleigh and a further event scheduled for Tipton St John.\r\n\r\n[caption id=\"attachment_2922\" align=\"aligncenter\" width=\"480\"]<img class=\"wp-image-2922 size-full\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Flood-Drop-in-Event-Newton-Poppleford.png\" alt=\"Group of people at Flood Drop in Event at Newton Poppleford.\" width=\"480\" height=\"360\" \/> Drop-in event at Newton Poppleford.[\/caption]\r\n\r\nIf you are aware of any flooding in your area and not had the opportunity to discuss this with us, then please do contact us through the <a href=\"mailto:floodrisk@devon.gov.uk\">floodrisk@devon.gov.uk<\/a> mailbox or alternatively report the incident on the Flood Online Reporting Tool (Fort) detailed below in this newsletter."},{"title":"12th \u2013 14th January Flood Event","sub-anchor":"12th-%e2%80%93-14th-january-flood-event","text":"A flood investigation report will also be published shortly on our website detailing flooding that occurred on 12<sup>th<\/sup> to 14<sup>th<\/sup> January 2023. 27 properties in total were recorded across Devon to have flooded internally, with 24 of those affected in communities along the River Exe. The worst affected locations were Bickleigh, Exebridge and Oakfordbridge, which saw flooding due to high levels along the River Exe.\r\n\r\nMany properties in this area already have Property Flood Resilience (PFR) measures installed, either funded by themselves or through <a href=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/flood-resilience\/property-flood-resilience-funding-scheme\/\">Devon\u2019s individual property flood resilience scheme<\/a>. An additional five properties which we would have expected to flood were protected in this event. Whilst two other properties had their measures overtopped due to large vehicles driving through road closures and creating bow waves.\r\n\r\n[caption id=\"attachment_2931\" align=\"aligncenter\" width=\"258\"]<img class=\"wp-image-2931 size-full\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Mid-Devon-Property-with-PFR-barrier.png\" alt=\"Image of property with PFR flood barrier installed on door.\" width=\"258\" height=\"309\" \/> A property in Mid Devon with their PFR barrier keeping floodwaters from the River Exe out in January 2023. Source: Local resident.[\/caption]\r\n\r\n[caption id=\"attachment_2916\" align=\"aligncenter\" width=\"395\"]<img class=\"wp-image-2916 size-full\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/DCC-contractor-clearing-trees.jpg\" alt=\"Digger using claw to remove wood debris\/trees washed up against a bridge during flood event.\" width=\"395\" height=\"710\" \/> DCC contractor clearing trees washed up against a bridge along the River Exe. Source: DCC Highways.[\/caption]\r\n\r\nThe event saw a heavy impact on Devon\u2019s highway network and we would like to thank all those involved in responding to this event, in particular the efforts of our Highways and Structures colleagues.\r\n\r\nIf you have been affected by internal property flooding please report this on <a href=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/report-flooding-to-property\/\">FORT<\/a> which is our Flood Online Reporting Tool.\u00a0 Flooding, including muddy flood water or soil erosion from local land entering the water system should also be reported to the Environment Agency Incident Hotline number: 0800 807060.\u00a0 It\u2019s a freephone number and is available 24\/7. For more information on <a href=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/who-to-contact-if-you-experience-flooding\/\">who to contact during or after a flood event<\/a> please refer to our website."}]},{"title":"Natural Flood Management (NFM)","anchor":"natural-flood-management-nfm","text":"DCC\u2019s Flood and Coastal Risk Management Team is committed to the delivery of flood improvement works throughout the county and will continue to endorse NFM measures either as standalone projects or within larger flood improvement schemes to future proof against the effects of climate change. To progress this, DCC is currently working in partnership with the Environment Agency to deliver NFM pilot studies in a few selected locations across Devon.","sub_sections":[{"title":"Kit Brook Natural Flood Management","sub-anchor":"kit-brook-natural-flood-management","text":"DCC were able to provide some funding to support the Kit Brook River Restoration Project which has enabled NFM works to be installed in the Chardstock area. This included the leaky dams shown below, where using fixed point photography has already been shown to be attenuating flows.\r\n\r\n<img class=\"aligncenter wp-image-2929 size-full\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Leaky-Dam-1.png\" alt=\"\" width=\"750\" height=\"422\" \/>\r\n\r\n[caption id=\"attachment_2930\" align=\"aligncenter\" width=\"750\"]<img class=\"wp-image-2930 size-full\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Leaky-Dam-2.png\" alt=\"Natural dam controlling the flow of water.\" width=\"750\" height=\"428\" \/> Leaky dams installed in the Chardstock areas as part of the Kit Brook Restoration Project. Source: Chardstock Eco-Group[\/caption]"},{"title":"Devon, Cornwall and Isles of Scilly Nature Based Solutions and Natural Flood Management Group ","sub-anchor":"devon-cornwall-and-isles-of-scilly-nature-based-solutions-and-natural-flood-management-group","text":"The Devon, Cornwall and Isles of Scilly Nature Based Solutions and Natural Flood Management Group (DCIoS NBS &amp; NFM Group) continues to share knowledge and learning across organisations, taking the opportunity to expand this sharing of information.\r\n\r\nThe group have had successful hybrid meetings combined with site visits with some valuable learning from academic and industry experts.\r\n\r\n[caption id=\"attachment_2918\" align=\"aligncenter\" width=\"1269\"]<img class=\"wp-image-2918 size-full\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/DNP-Headwaters-project.jpg\" alt=\"Image of collapsed wall on Dartmoor\" width=\"1269\" height=\"955\" \/> Dartmoor Headwaters Project near Walkhampton. Source: DCC Flood and Coastal Risk Management team[\/caption]\r\n\r\nThe project board consists of the Environment Agency, Devon County Council and Cornwall Council. The latest group meeting was in March 2023, which combined a hybrid meeting and site visit to look at the NFM pilot measures that have been put in place at Walkhampton as part of the Dartmoor Headwaters Project."}]},{"title":"Are you carrying out works within a watercourse?","anchor":"are-you-carrying-out-works-within-a-watercourse","text":"If you need to carry out works in an Ordinary Watercourse, then <strong>please apply for Land Drainage Consent.<\/strong> You can find information on the consenting process on our <a href=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/land-drainage-consent\/\">Land Drainage Consent webpage<\/a> and you can <a href=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/apply-for-land-drainage-consent\/\">apply for a consent online using this form<\/a>.\r\n\r\n[caption id=\"attachment_2928\" align=\"aligncenter\" width=\"263\"]<img class=\"wp-image-2928 size-full\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/LDC-Image-p6.png\" alt=\"image shows natural flood barrier designed to help the flow of water and prevent flooding.\" width=\"263\" height=\"200\" \/> <em>Any works within an ordinary watercourse channel will require Land Drainage Consent, such as this \u2018leaky dam\u2019. Source: DCC Flood Risk Management Team<\/em>[\/caption]\r\n\r\nThere is now also <a href=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/land-drainage-consent\/nfm-guidance-for-land-drainage-consent\/\">guidance available on what should be considered as part of NFM works in watercourses.<\/a>\r\n\r\nPlease note that works in watercourses are restricted from October through to the end of May to protect fish spawning, migration, and other biodiversity. Please ensure you apply for Land Drainage Consent in good time to allow appropriate works to be programmed and completed during the summertime window when river levels are low and there are fewer environmental impacts.\r\n\r\n[caption id=\"attachment_2913\" align=\"aligncenter\" width=\"300\"]<img class=\"wp-image-2913 size-medium\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Atlantic-Salmon-e1686052626849-300x152.png\" alt=\"Image of Atlantic Salmon\" width=\"300\" height=\"152\" \/> Atlantic Salmon migrating upstream. Credit Ann and Steve Toon \/ Alamy Stock Photo[\/caption]","sub_sections":null},{"title":"Defra Six Year Programme 2021-2027","anchor":"defra-six-year-programme-2021-2027","text":"We are now in year 3 of Defra\u2019s \u00a35.2bn 6-year programme for flood and coastal erosion risk management, with a target of better protecting 336,000 properties across the country. We cannot tackle this on our own, so there is a reliance on collaboration with all Risk Management Authorities including the Environment Agency, water companies, Unitary, County and District Councils and Highways. Each authority has their part to play in tackling the many sources of flood risk to achieve the target set. In the early years of the programme there are many studies and investigations taking place for future investment, as such the number of properties protected increases year on year throughout the programme. The schemes delivered in the Devon, Cornwall and Isles of Scilly for 2022\/23 reduced the risk of flooding to 520 properties, whereas the target for 2023\/24 is 1,248.","sub_sections":null},{"title":"Flood Improvement Projects","anchor":"flood-improvement-projects","text":"DCC continue working on the delivery of flood improvement schemes to make Devon more resistant and resilient to flooding. At the time of writing DCC is working with our consultants to investigate and develop schemes in over 12 locations that, subject to funding, will be delivered over the coming funding window up to 2027.\r\n\r\nMany of the schemes currently being progressed are property flood resilience (PFR) focused. The sector continues to experience significant challenges due to the availability and rising costs of materials and the increased demand. DCC have worked tirelessly to continue to progress these and to help overcome the challenges posed.","sub_sections":[{"title":"Ongoing Studies and Initial Assessments","sub-anchor":"ongoing-studies-and-initial-assessments","text":"Flood studies in the following locations are continuing to be developed. High level options will be considered for any further investment in detailed investigations and\/or development.\u00a0Early indications suggest a programme of over \u00a313million in the coming years with over \u00a310million of external funding to be justified and drawn down.\r\n<table width=\"0\">\r\n<tbody>\r\n<tr>\r\n<td width=\"217\">Seaton<\/td>\r\n<td width=\"217\">Sidmouth<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Budleigh Salterton<\/td>\r\n<td width=\"217\">Barnstaple East<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Exmouth<\/td>\r\n<td width=\"217\">Teignmouth<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Newton Abbot<\/td>\r\n<td width=\"217\">Tiverton<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Crediton<\/td>\r\n<td width=\"217\">Totnes<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Bideford<\/td>\r\n<td width=\"217\">Exeter<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Kingsbridge<\/td>\r\n<td width=\"217\">Ilfracombe<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Okehampton<\/td>\r\n<td width=\"217\">Dartmouth<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Dawlish<\/td>\r\n<td width=\"217\"><\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\nOur programme of initial assessments is also continuing to be progressed in the following locations:\r\n<table width=\"0\">\r\n<tbody>\r\n<tr>\r\n<td width=\"217\">Bampton, Shillingford<\/td>\r\n<td width=\"217\">Lynmouth<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Kennford, Kenn<\/td>\r\n<td width=\"217\">Westwood, Broadclyst<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Salcombe<\/td>\r\n<td width=\"217\">Lee<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Bovey Tracey<\/td>\r\n<td width=\"217\">North Tawton<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Uffculme<\/td>\r\n<td width=\"217\">Kerswell, Dulford<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Rockbeare<\/td>\r\n<td width=\"217\">Woodbury<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Newton Poppleford<\/td>\r\n<td width=\"217\">Kingskerswell<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Ashburton<\/td>\r\n<td width=\"217\">Newton St Cyres<\/td>\r\n<\/tr>\r\n<tr>\r\n<td width=\"217\">Beer<\/td>\r\n<td width=\"217\"><\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>\r\nThe purpose of these initial assessments is to populate our future programme of works and also identify whether any quick wins can be implemented to reduce the risk in a shorter time frame.\r\n\r\n&nbsp;"},{"title":"Beeson","sub-anchor":"beeson","text":"We now have a contractor on board to deliver the much-needed flood alleviation works in Beeson, South Devon. The works include the provision of a new double culvert arrangement in the village, along with works downstream in order to accommodate the additional flows that will be passed forward. We would like to thank the residents for their patience and for accommodating elements of the scheme on private land. The works commenced on site late May 2023 and subject to weather, should be complete within 4 to 5 weeks."},{"title":"Stokeinteignhead PFR","sub-anchor":"stokeinteignhead-pfr","text":"Works in Stokeinteignhead are close to completion. Currently snagging works and the final few properties PFR are being installed. We would like to thank the Neighbourhood Highways Team for going above and beyond to help address a blockage in a local watercourse that was causing complications for a property and the delivery of their PFR.\r\n\r\n[caption id=\"attachment_2927\" align=\"aligncenter\" width=\"360\"]<img class=\"wp-image-2927 size-full\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Image-from-p9.jpg\" alt=\"exposed culverted watercourse and the material removed by Highways in Stokeinteignhead.\" width=\"360\" height=\"339\" \/> Photo showing the exposed culverted watercourse and the material removed by Highways in Stokeinteignhead. Source: DCC Highways[\/caption]"},{"title":"Colaton Raleigh and Broadhempston","sub-anchor":"colaton-raleigh-and-broadhempston","text":"The proposal for a joint PFR project for Colaton Raleigh and Broadhempston has been well received by residents, with 21 property owners having registered for inclusion in the project. The initial property surveys have been undertaken with the tender documents required to engage with a product supplier and installer now being produced.\r\n\r\nDue to the recent flooding event affecting this location we have re-engaged with the community to encourage further property owners to sign up to the project. We are very keen in providing protection to as many properties as possible to maximise benefit from the project and feel this is an appropriate cause of action. Delays will be kept to a minimum to enable the flood measure to be implement at the earliest opportunity."},{"title":"Longbrook Street, Exeter PFR","sub-anchor":"longbrook-street-exeter-pfr","text":"Listed building consent has been submitted to Exeter City Council at the end of January 2023 for PFR for at least 4 of the affected residential properties along Longbrook Street. Discussions are going well with the aim of delivering these improvements this current financial year."},{"title":"Barnstaple West ","sub-anchor":"barnstaple-west","text":"The Proposal for a PFR project for Barnstaple has been well received by the residents of Sticklepath Terrace and Clifton Street area with 47 property owners having registered for inclusion in the project. The Initial property surveys have been undertaken with the tender documents required to engage with a product supplier and installer now being produced."},{"title":"Axminster PFR","sub-anchor":"axminster-pfr","text":"The Axminster Millbrook PFR scheme has been completed with post installation surveys being undertaken in the last week of April 2023. The scheme has been delivered within 18 months of the flood incident and completed under the original expected budget.\r\n\r\n[caption id=\"attachment_2915\" align=\"aligncenter\" width=\"556\"]<img class=\"wp-image-2915 size-large\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Axminster-PFR-door-2-556x600.jpg\" alt=\"Image of flood resilient door \" width=\"556\" height=\"600\" \/> Images of completed PFR scheme in Axminster, photo on the left shows a flood door. The photo on the right shows the flood barrier rails and channel in a face-fixing installation which allows the resident to place their barriers into to make an impermeable barrier to prevent floodwaters entering through the front door. Source: DCC PFR installer.[\/caption]"},{"title":"Seaton","sub-anchor":"seaton","text":"As part of our ongoing investigations in Seaton, DCC met with the community group to discuss the longlist of options in November and are now looking at modelling the shortlist options. Separately DCC have been working hard to seek solutions to issues that have emerged post the flooding event in October 2021 with relevant landowners and partners. There has also been close working with our DCC Engineering Design Group colleagues to ensure that the drainage for the new cycle path is appropriately future-proofed."}]},{"title":"Property Flood Resilience Funding Scheme","anchor":"property-flood-resilience-funding-scheme","text":"The information below has been maintained from the last newsletter and explains the PFR funding scheme. For more information on the PFR scheme and funding policy, and to download an application form please <a href=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/flood-resilience\/property-flood-resilience-funding-scheme\/\">visit our website<\/a>.\r\n\r\nThe PFR scheme is available for residential property owners to apply for up to \u00a35,000 worth of funding. With this, a property survey will be carried out and a list of recommended resilience measures produced, which will need to be purchased and then installed by a selected contractor. Any additional budget requirements over \u00a35,000 are at the expense of the property owner.\r\n\r\nThere is limited funding, with an allocation to be made available each year by Defra, Local Levy and DCC. Applications will therefore be prioritised based on the criteria set out in DCC\u2019s PFR Policy to maximize the number of properties benefitting from this opportunity and to ensure those properties with the greatest need will receive the funding.","sub_sections":null},{"title":"Devon Resilience Innovation Project","anchor":"devon-resilience-innovation-project","text":"The Devon Resilience Innovation Project (DRIP) is one of twenty-five projects in the country funded by Defra as part of the flagship \u00a3150 million Flood and Coastal Resilience Innovation Programme to develop and test new approaches to flood resilience.\r\n\r\n<img class=\"size-medium wp-image-2919 aligncenter\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/DRIP-logo-300x95.png\" alt=\"\" width=\"300\" height=\"95\" \/>\r\n\r\nDevon County Council and 18 partners have been awarded over \u00a37 million of funding over a 6-year period (April 2021 \u2013 March 2027) to deliver thirty flood resilience pilot projects in rapid response catchments in Devon, including installing NFM measures, PFR measures in targeted community facilities and providing localised surface water flood warning systems. The project will also develop and test new spatial planning tools to ensure flood resilience is part of the decision-making process.\r\n\r\n<img class=\"size-medium wp-image-2920 aligncenter\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/EA-Logo-300x159.png\" alt=\"\" width=\"300\" height=\"159\" \/>\r\n<p style=\"text-align: justify\">DRIP is an opportunity to work towards creating climate resilient places which are greener, cleaner, and more flood resilient. Overall DRIP will test and trial a range of replicable low-cost resilience actions that can be delivered by local authorities and communities in the future where traditional flood defences are shown not to be appropriate or cost beneficial.<\/p>\r\n<p style=\"text-align: justify\">Communities have been identified and selected by the project partners to become part of the project. Partners will start engaging with targeted communities to develop further the flood resilience interventions over the next 6 months. You can view the <a href=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/flood-and-coastal-resilience-innovation-programme-fcrip\/\">Project Map<\/a> on our website.<\/p>","sub_sections":[{"title":"Update for 2023","sub-anchor":"update-for-2023","text":"In the first quarter of 2023, progress has been made with regards to community and stakeholder engagement in the three DCC led NFM pilot projects: South Pool, Exton, and Stokeinteignhead. Engagement events have included presentations, village hall events and meetings, and extensive consultation with landowners in these catchments, with a view to fulfilling one of our main project aims - \u00a0implementation of NFM in upper catchments.\r\n\r\n[caption id=\"attachment_2926\" align=\"aligncenter\" width=\"856\"]<img class=\"wp-image-2926 size-full\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Hedge-NFM-p12.jpg\" alt=\"Image shows kested hedge row\" width=\"856\" height=\"571\" \/> A Kested Hedge - a NFM intervention to slow the flow of surface water. Source: DRIP[\/caption]\r\n<p style=\"text-align: justify\">When considering the implementation of NFM interventions within the target catchments, the NFM hierarchy should be followed, by first considering the opportunities to restore natural processes (increasing infiltration by improving land management practices), and then considering the opportunities to slow the flow of water and increase water storage within the landscape (e.g. leaky dams and attenuation ponds). DCC have commissioned NFM specialist farm advisors from the Westcountry Rivers Trust to work with landowners within the catchments being targeted by DCC for NFM.<\/p>\r\n\r\n\r\n[caption id=\"attachment_2933\" align=\"aligncenter\" width=\"732\"]<img class=\"wp-image-2933 size-full\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Site-visit-to-Kentisbeare-p12.jpg\" alt=\"Group of people discussing DRIP project\" width=\"732\" height=\"515\" \/> A Site Visit to Kentisbeare \u2013 a catchment targeted for NFM improvements by DRIP partner, Blackdown Hills AONB. Source:DRIP[\/caption]\r\n\r\nThe DRIP partners are also progressing their own NFM projects, with measures beginning to be implemented in areas of the Culm Catchment by the Blackdown Hills AONB team. The North Devon Biosphere team are progressing with their project to reinstate historic catch meadows within Combe Martin and implement NFM measures across the Little Dart catchment. Several depth sensors have been installed within both catchments to monitor the performance and effectiveness of the NFM interventions. Beavers are continuing to carry out their own NFM on land managed by another of our partners, the Devon Wildlife Trust, who maintain several beaver sites in the Otter catchment."},{"title":"Property Flood Resilience for community buildings ","sub-anchor":"property-flood-resilience-for-community-buildings","text":"Another important resilience aim of the project is the installation of PFR for community assets vulnerable to surface water flooding. Community assets are organisations and businesses such as village halls, village shops, doctor\u2019s surgeries, pubs and cafes, which can assist people when they have suffered flooding. Village halls have been used in emergency flooding situations to house flood victims and provide them with a warm space to sleep and stay whilst waters recede. Shops and pubs can provide food and hot drinks in a flood event when flood victims cannot use their own kitchen facilities. Making these places flood ready and resilient in flood events, provides communities with added capacity to withstand and recover from a flash flood. Grants are available from DCC\u2019s Flood Risk Management team for PFR on residential buildings. For more information, please see the PFR Funding Scheme section of this newsletter.\r\n\r\n[caption id=\"attachment_2921\" align=\"aligncenter\" width=\"371\"]<img class=\"wp-image-2921 size-full\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Flood-door-gates-Exton.jpg\" alt=\"Image shows flood door gates at Exton Village Hall protecting building from water flood event.\" width=\"371\" height=\"242\" \/> Flood Door Gates on Exton Village Hall, working to protect the hall in a surface water flood event. Source: Dev on Live[\/caption]\r\n\r\nThe PFR element of the DRIP will commence once the target catchments have been finalised.\u00a0 DCC are working with JBA Consulting to progress this project, with the aim to engage with the target communities over the next quarter and to carry out PFR suitability surveys prior to offering grants for PFR on these important community hubs."},{"title":"Flood Mapping and Warning","sub-anchor":"flood-mapping-and-warning","text":"The Environment Agency provides a national flood warning service to areas at risk of flooding from rivers and the sea. Further details on this can be found here: <a href=\"https:\/\/check-for-flooding.service.gov.uk\/\">https:\/\/check-for-flooding.service.gov.uk\/<\/a>.\r\n\r\nCurrently there is no equivalent flood warning system for areas at risk from surface water flooding \u2013 flooding caused by intense rainfall events resulting in water ponding or flowing overland. DCC are leading on a DRIP pilot project which aims to trial a surface water flood warning service within five selected communities across Devon. DCC have commissioned JBA Consulting to manage this pilot project. They are working with Kisters to provide the software required for the surface water flood warning system. Within the next quarter, DCC aim to engage with all five of the communities selected for this trial. The support of the communities is vital to the success and evaluation of this pilot project."},{"title":"Flood Hub Website","sub-anchor":"flood-hub-website","text":"<p style=\"text-align: justify\">One of the legacies of DRIP will be the development of a comprehensive website available to the public which will act as a one-stop-shop for all things flooding related within Devon and the Southwest. It aims to bring together information from all flood risk authorities in the Southwest including local Risk Management Authorities such as district and county councils, Environment Agency and water companies. The South West Flood resilience Hub will be a platform through which information can be accessed, issues can be communicated, and resilience can be quantified.<\/p>\r\n<p style=\"text-align: justify\">A current example of this kind of platform (operating in the North West of the UK) can be found here <a href=\"https:\/\/thefloodhub.co.uk\/\">https:\/\/thefloodhub.co.uk\/<\/a><\/p>"}]},{"title":"The Devon Community Resilience Forum","anchor":"the-devon-community-resilience-forum","text":"The Devon Community Resilience Forum, supported by Devon Communities Together, provides invaluable support and engagement to local communities ensuring they are prepared for the emergencies they could encounter. The Forum is well established between Devon County Council, the Environment Agency, Devon &amp; Somerset Fire &amp; Rescue and Devon &amp; Cornwall Police to help bring communities together and share their knowledge and experiences.\r\n\r\n<img class=\"aligncenter wp-image-2917 size-medium\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Devon-Community-RF-logo-300x239.png\" alt=\"\" width=\"300\" height=\"239\" \/>\r\n\r\nThe Forum is excited to be holding a free in person event on <strong>Wednesday 17<sup>th<\/sup> May 2023 <\/strong>at Bridestowe Village Hall. You can register for the day on <a href=\"https:\/\/www.eventbrite.co.uk\/e\/devon-community-resilience-forum-day-event-wednesday-17th-may-bridestowe-tickets-558803906527\">Eventbrite<\/a>. The programme will include presentations and workshops:\r\n<ul>\r\n \t<li>Find out how you can help prevent emergencies, such as flooding.<\/li>\r\n \t<li>Take part in an emergency exercise to find out how prepared you are in case of the unexpected.<\/li>\r\n \t<li>Hear from, and chat to, communities and groups that already have their Community Emergency Plan in place.<\/li>\r\n \t<li>Join experts from local organisations such as the Environment Agency and Devon County Council, who will be on hand to offer support and advice.<\/li>\r\n \t<li>Enjoy refreshments and a complementary local buffet lunch.<\/li>\r\n \t<li>Discover how to apply for grants to help you create or update\/enhance your plan.<\/li>\r\n<\/ul>\r\nFunding opportunities are still available to support communities with developing their own emergency plans and the purchase of essential equipment to operate the plans and help make their communities more resilient. More information on the Grant Funding for Community Emergency Resilience can be found on the <a href=\"https:\/\/www.devoncommunities.org.uk\/grant-funding-emergency-flood-resilience\">Devon Communities Together website<\/a>.","sub_sections":null},{"title":"Report flooding to your property on the Flood Online Reporting Tool, FORT","anchor":"report-flooding-to-your-property-on-the-flood-online-reporting-tool-fort","text":"Please use the Flood Online Reporting Tool (FORT) to report current or recent flooding. We use this to gather and record information about flooding that has taken place, in particular when internal flooding of a property has occurred.\r\n\r\n<img class=\"alignleft wp-image-2924 size-medium\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/FORT-Logo-1-300x156.png\" alt=\"\" width=\"300\" height=\"156\" \/><img class=\"alignnone wp-image-2925 \" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/FORT-Logo-2-300x300.png\" alt=\"\" width=\"183\" height=\"183\" \/>","sub_sections":null},{"title":"Sustainable Drainage Systems (SuDS)","anchor":"sustainable-drainage-systems-suds","text":"We are finalising Devon\u2019s Sustainable Drainage Guidance and once it is ready, it will be made available on our website <a href=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/planning-and-development\/sustainable-drainage\/\">here<\/a>, for use by the public, developers and Local Planning Authorities.\r\n\r\nBack in December 2022, the Association of SuDS Authorities (ASA), along with several other signatories have signed a letter to the Prime Minister encouraging Schedule 3 of the Flood and Water Management Act 2010 to be implemented as it has been delayed for 10 years. Subsequent to this, the Government announced on 10 January 2023 that implementation of Schedule 3 is expected in 2024.\u00a0 This will make County and Unitary Local Authorities a SuDS Approval Body (SAB).\u00a0 The <a href=\"https:\/\/eur02.safelinks.protection.outlook.com\/?url=https%3A%2F%2Fwww.gov.uk%2Fgovernment%2Fpublications%2Fsustainable-drainage-systems-review&amp;data=05%7C01%7Chock.lee%40devon.gov.uk%7C8a94174330194b8640ea08db09b8f468%7C8da13783cb68443fbb4b997f77fd5bfb%7C0%7C0%7C638114462285618694%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&amp;sdata=KZZXRkKzxEWK1GIb6n2HSHJiPwIS%2FiCc4Z61bf7212Y%3D&amp;reserved=0\">Government's review<\/a> recommends that this duty is placed within the Lead Local Flood Authority (LLFA). \u00a0We have been participating in the various survey on Schedule 3 implementation conducted by ASA and skills survey by Defra.\r\n\r\nASA are intending to organise the ASA conference during the Flood and Coastal Conference 2023.","sub_sections":null},{"title":"Useful Information","anchor":"useful-information","text":"The following documents provide useful information and guidance:\r\n\r\n<a href=\"https:\/\/www.gov.uk\/government\/publications\/national-flood-and-coastal-erosion-risk-management-strategy-for-england--2\">National Flood and Coastal Erosion Risk Management Strategy<\/a>\r\n\r\n<a href=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/document\/devon-local-flood-risk-management-strategy-2021-2027\/\">Devon\u2019s Local Flood Risk Management Strategy 2021-2027<\/a>\r\n\r\n<a href=\"https:\/\/devoncc.sharepoint.com\/:b:\/s\/PublicDocs\/Planning\/ER0kKHBPp25CjCyWLGi-GT0BYiOt5enZjjsnyPlebAsF_A\">NFM Guidance for Devon<\/a> (PDF) \/ Accessible version: <a href=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/document\/nfm-guidance-for-devon\/\">NFM Guidance for Devon Webpage<\/a>\r\n\r\n<a href=\"https:\/\/devoncc.sharepoint.com\/:b:\/s\/PublicDocs\/Planning\/EXHK7X9mZKdPsH8wJOBJmnsBXp7XZ_V6T88aSN16P2APXg?e=CxB5rh\">Living with Water Leaflet<\/a>","sub_sections":null},{"title":"Meet the Team","anchor":"meet-the-team","text":"<table style=\"width: 1174px\" width=\"905\">\r\n<tbody>\r\n<tr>\r\n<td style=\"width: 443px\" width=\"291\">Flood &amp; Coastal Risk Manager<\/td>\r\n<td style=\"width: 731px\" width=\"501\">Martin Hutchings<\/td>\r\n<\/tr>\r\n<tr>\r\n<td style=\"width: 443px\" width=\"291\">Flood &amp; Coastal Risk Project Engineer<\/td>\r\n<td style=\"width: 731px\" width=\"501\">John Galt<\/td>\r\n<\/tr>\r\n<tr>\r\n<td style=\"width: 443px\" width=\"291\">Flood &amp; Coastal Risk Officer - Projects<\/td>\r\n<td style=\"width: 731px\" width=\"501\">Vacant<\/td>\r\n<\/tr>\r\n<tr>\r\n<td style=\"width: 443px\" width=\"291\">Flood &amp; Coastal Risk SuDS Engineer<\/td>\r\n<td style=\"width: 731px\" width=\"501\">Hock Lee<\/td>\r\n<\/tr>\r\n<tr>\r\n<td style=\"width: 443px\" width=\"291\">Flood &amp; Coastal Risk Officer - SuDS<\/td>\r\n<td style=\"width: 731px\" width=\"501\">Joshua Lewis<\/td>\r\n<\/tr>\r\n<tr>\r\n<td style=\"width: 443px\" width=\"291\">Principal Flood &amp; Coastal Risk Officer - Area issues and Land Drainage Consents<\/td>\r\n<td style=\"width: 731px\" width=\"501\">Jessica Bishop<\/td>\r\n<\/tr>\r\n<tr>\r\n<td style=\"width: 443px\" width=\"291\">Flood &amp; Coastal Risk Officer - Area issues and Land Drainage Consents<\/td>\r\n<td style=\"width: 731px\" width=\"501\">Thomas Aldridge<\/td>\r\n<\/tr>\r\n<tr>\r\n<td style=\"width: 443px\" width=\"291\">Flood &amp; Coastal Risk Officer - Area issues and Land Drainage Consents<\/td>\r\n<td style=\"width: 731px\" width=\"501\">Jago Burris<\/td>\r\n<\/tr>\r\n<tr>\r\n<td style=\"width: 443px\" width=\"291\">FCRIP Project Manager<\/td>\r\n<td style=\"width: 731px\" width=\"501\">Doe Fitzsimmons<\/td>\r\n<\/tr>\r\n<tr>\r\n<td style=\"width: 443px\" width=\"291\">FCRIP Project Officer<\/td>\r\n<td style=\"width: 731px\" width=\"501\">Gale Alexander<\/td>\r\n<\/tr>\r\n<tr>\r\n<td style=\"width: 443px\" width=\"291\">Environment Technician<\/td>\r\n<td style=\"width: 731px\" width=\"501\">Kieran Miller<\/td>\r\n<\/tr>\r\n<tr>\r\n<td style=\"width: 443px\" width=\"291\">Graduate Flood &amp; Coastal Risk Intern (Area issues, Land Drainage Consents &amp; FCRIP)<\/td>\r\n<td style=\"width: 731px\" width=\"501\">Freya Money<\/td>\r\n<\/tr>\r\n<tr>\r\n<td style=\"width: 443px\">Graduate Flood &amp; Coastal Risk Projects Intern<\/td>\r\n<td style=\"width: 731px\">Ruilin Jiao<\/td>\r\n<\/tr>\r\n<\/tbody>\r\n<\/table>","sub_sections":null},{"title":"What to do in the event of a flood - Your guide on who to call ","anchor":"what-to-do-in-the-event-of-a-flood-your-guide-on-who-to-call","text":"In the event of a flood, there are many authorities available to help. Below outlines who should be contacted for the various types of flooding incidents and emergencies that occur. The local authorities rely on information reported to them to inform any investigations and prioritisation of investment.\r\n\r\nIf it is an <strong>emergency<\/strong> and there is danger to life as a result of flooding, you should not hesitate to call <strong>999<\/strong>\r\n\r\n<strong>To report flooding of the highway and blocked drains<\/strong> contact Devon County Council\u2019s Highway Customer Service Centre on <strong>0345 155 1004 <\/strong>or visit the <a href=\"https:\/\/www.devon.gov.uk\/roadsandtransport\/maintaining-roads\/managing-the-network\/flooding-and-drainage\/report-standing-water-flooding-or-blocked-drains\/\">Roads and Transport webpage<\/a>. Office hours are Monday to Friday 8am \u2013 8pm and Saturdays 9am \u2013 1pm. For emergencies outside of these hours call <strong>01392 383329<\/strong>\r\n\r\n<strong>For any flooding on major trunk roads<\/strong> (the M5, A30, A38, A35 and A303) contact the Highways Agency on <strong>0300 123 5000 <\/strong>(24 hour service)\r\n\r\n<strong>To report flooding from sewers and water pipes<\/strong> contact South West Water on\r\n\r\n<strong>0344 346 2020 <\/strong>(24 hour service)\r\n\r\n<strong>For enquiries about flood warnings<\/strong> contact the Environment Agency\u2019s Floodline on\r\n\r\n<strong>0345 988 1188<\/strong> (24 hour service)\r\n\r\n<strong>For general enquiries about Main River or flooding from the sea<\/strong> contact the Environment Agency on <strong>03708 506 506<\/strong>\r\n\r\n<strong>For all other flooding enquiries<\/strong> contact the Devon County Council Flood Risk Management Team on <strong>0345 155 1015<\/strong> or email <a href=\"mailto:floodrisk@devon.gov.uk\">floodrisk@devon.gov.uk<\/a>.\r\n\r\n<strong>Preparing for a flood<\/strong>\r\n\r\nPlease refer to Devon County Council and Environment Agency web pages for advice on what to do before, during and after a flood. In the first instance of flooding and sandbag requests contact your local District or Parish Council to be directed to any local sandbag supplies that may be available.\r\n\r\n<img class=\"aligncenter wp-image-2923 size-large\" src=\"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-content\/uploads\/sites\/73\/2023\/06\/Flood-Warning-p17-800x374.png\" alt=\"\" width=\"800\" height=\"374\" \/>\r\n\r\n<strong>Sign up to flood warnings:<\/strong> <a href=\"https:\/\/www.gov.uk\/sign-up-for-flood-warnings\">https:\/\/www.gov.uk\/sign-up-for-flood-warnings<\/a>","sub_sections":null}]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-json\/wp\/v2\/documents\/2908","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-json\/wp\/v2\/documents"}],"about":[{"href":"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-json\/wp\/v2\/types\/dcc_docs_document"}],"author":[{"embeddable":true,"href":"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-json\/wp\/v2\/users\/2216"}],"version-history":[{"count":6,"href":"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-json\/wp\/v2\/documents\/2908\/revisions"}],"predecessor-version":[{"id":3275,"href":"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-json\/wp\/v2\/documents\/2908\/revisions\/3275"}],"wp:attachment":[{"href":"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-json\/wp\/v2\/media?parent=2908"}],"wp:term":[{"taxonomy":"dcc_docs_category","embeddable":true,"href":"https:\/\/www.devon.gov.uk\/floodriskmanagement\/wp-json\/wp\/v2\/documents_category?post=2908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}