Projects / Works / SchemesLead AuthorityStudy, Design or Works2019/20 DCC FRM Contribution
£
2019/20 DCC Flood Prevention
£
Other Funding Source £ Details of Proposal
Sidmouth Surface Water Improvements – DesignDCCW40,000100,000369,000Completion of Phase 1 surface water drainage works and the detailed design and construction of phase 2 flood attenuation works.
Clyst St MaryEAW50,000Contribution towards the major scheme being delivered by the Environment Agency to support the surface water management element of the scheme.
Ottery St Mary NFMDCCW40,000Delivery of Natural Flood Management measures in partnership with the East Devon Catchment Partnership and to progress hard engineered improvements, as recommended in the flood study
Collaton RaleighDCCS20,000Catchment study and consideration of options including the proposal of upstream natural flood management

 Recent and Current Work

The following case studies have been prepared to highlight some of the excellent work that has been achieved, is being developed, and the different opportunities that have been adopted for funding the schemes.