Pepperdon Retaining Wall Additional Information
===============================================

**Please provide the following operational, technical, and ecological files held by the EDG to allow independent community experts to assess the physical footprint of the live works starting on Monday 20 July:**

**1. Verification of Ecological Constraints, Communications &amp; Statutory Compliance**

**a. All correspondence, consultation logs, assent forms, or advice notes between the EDG and the Environment Agency or Natural England regarding the A382 Pepperdon wall/Wray Brook works.**

Devon County Council does not hold this information. This is because there is no correspondence between Engineering Design Group (EDG) and the Environment Agency (EA) or Natural England. EDG have liaised with the Flood Risk Team for Land Drainage Consent as the Wray Brook is an ordinary watercourse and not a main river.

**b. The underlying technical and environmental datasets, screening checklists, or officer reports used by the LLFA to legally justify and sign off the issuance of the Land Drainage Consent in the absence of an EMP.**

Land Drainage Consent has been provided in response to Question 2 of this previous information request [Pepperdon Retaining Wall](https://www.devon.gov.uk/accesstoinformation/information_request/pepperdon-retaining-wall/)

**c. Copies of any site-specific ecological surveys or biological data held by the EDG confirming the actual presence of protected fish spawns or crustacean species at or adjacent to these exact wall coordinates.**

This information is exempt from disclosure under Section 21 of the Freedom of Information Act 2000 (Information Reasonably Accessible by Other Means).  The requested information is already publicly available on this Department for Environment Food and Rural Affairs (DEFRA) [EA Ecology &amp; Fish Data Explorer](https://environment.data.gov.uk/ecology/explorer/) webpage.

We can advise that evidence is located on public records confirming the presence of fish within the watercourse. Fish have also been noted within the site boundary.

**2. The Project Timetable and Detailed Construction Programme**

**The master Construction Programme (such as a Gantt chart, Microsoft Project file, or Critical Path Analysis) compiled or approved by the EDG. This must include the specific timeline for individual phases of the live work (e.g. excavation, wall construction, water diversion/pumping, backfilling, and concrete curing times). Community experts require this to assess if the continuous 6-week total closure can be minimised or rephrased.**

As at 9th July 2026 (the date of this request), Devon County Council does not hold the requested information.

However, we can provide this [Programme of Works](https://devoncc.sharepoint.com/:b:/s/PublicDocs/InfoMgt/IQDmJgNwrl7iQZ7tWY23bDIvAYMG-Kf_kusl-kUo3bJbgVA?e=1IpEKw).

**3. The CDM 2015 Pre-Construction Information (PCI) Pack**

**The PCI pack compiled by the Principal Designer within the EDG for the Pepperdon wall works. Please specifically include the mandatory sections detailing “Environmental Restrictions and Risks” and “Significant Design Assumptions.”**

Please refer to this [Pre-Construction Information](https://devoncc.sharepoint.com/:b:/s/PublicDocs/InfoMgt/IQAs0rUx3Qs7Q7p9gu5cSrPOAXRuXQhQw8nuPLFYpPcwzdU?e=7SyOYz) document. “Environmental Restrictions and Risks” and “Significant Design Assumptions” can be found at items 3 and 4.

Some information has been redacted in grey.  This is because the information is exempt from disclosure under Regulation 13(1) of the Environmental Information Regulations 2004 (Personal Data).

Devon County Council cannot disclose personal information, if releasing it would contravene any of the provisions in the UK General Data Protection Regulation.  In this instance release of this information would contravene Principle (a) – Lawful, Fairness, and Transparency – of the UK GDPR and therefore the information is withheld.

**4. The Contractual Scope of Works and Works Information**

**The Scope of Works, Works Information, and Bill of Quantities drawn up by the EDG for this specific scheme. Independent community engineers require this data to review the specified excavation methods, materials, and machinery footprints.**

Information relating to works information has been provided in response to Question 1 and Question 3 of this previous information request [Pepperdon Retaining Wall](https://www.devon.gov.uk/accesstoinformation/information_request/pepperdon-retaining-wall/).

We can also provide the following:

[Works Order form](https://devoncc.sharepoint.com/:b:/s/PublicDocs/InfoMgt/IQDBGzpxTpO2TaV6Cl7MqVcyAZoFs54tZXg1bDBPtxONRUM?e=2PHg6W)

[Bill of Quantities](https://devoncc.sharepoint.com/:b:/s/PublicDocs/InfoMgt/IQCea5zdgBGCQ5P92By0Gg_nAYI6uu5T1-EkbXUGOyi9y4c?e=GKCrwh) drawn up by the EDG.

In addition, we have provided this [Vegetation removal ecological method statement](https://devoncc.sharepoint.com/:b:/s/PublicDocs/InfoMgt/IQCh0QzdxXHIQovNCbiaQec8AQQmuf3FF14pbQdTS-YsKWs?e=14qxZK).

Some information has been redacted in grey. This is because the information is exempt from disclosure under Regulation 12(5)(e) of the Environmental Information Regulations (Confidentiality of Commercial/Industrial Information). The information comprises detailed rates contained within a Bill of Quantities and is exempt from disclosure under Regulation 12(5)(e) of the Environmental Information Regulations 2004.

The requested information is commercial in nature and was provided within the context of a procurement and contractual arrangement. The rates are subject to an obligation of confidentiality and are not otherwise publicly available. The confidentiality serves to protect the legitimate economic interests of both the Council and the relevant supplier.

Disclosure of the detailed rates contained within the Bill of Quantities would be likely to prejudice the Council’s ability to secure best value for money in future procurements. The information would reveal detailed pricing structures that could be used by prospective bidders in future tendering exercises, reducing the Council’s negotiating position and potentially affecting the competitiveness of future procurement processes. The rates form part of a commercially sensitive pricing schedule. Disclosure would place detailed pricing information into the public domain, which could undermine the Council’s ability to conduct future procurement and contract negotiations effectively.

The Council has considered the public interest test required by Regulation 12(1)(b). The Council recognises the public interest in transparency, accountability and promoting public understanding of how public funds are spent. Disclosure would assist public scrutiny of procurement and contract management activities.

However, there is a stronger public interest in protecting legitimate commercial confidences where disclosure would be likely to cause real and significant commercial harm. Maintaining the exception helps to preserve effective competition in the marketplace, protects the Council’s ability to obtain best value for money in future procurements, and avoids unfairly disadvantaging contractors participating in Council tenders.

Having considered the competing public interest factors, the Council considers that the public interest in maintaining the exception outweighs the public interest in disclosure. The information is therefore withheld under Regulation 12(5)(e) of the Environmental Information Regulations 2004.

**5. The Risk Assessment and Method Statement (RAMS)**

**The Method Statement, Site Layout Plans, and Temporary Works Design (TWD) clearance calculations held by the EDG. Specifically, this must include documents detailing the physical working zone width, excavation limits, and temporary shoring plans. This data is required to verify the physical space constraints and evaluate the viability of single-lane traffic controls.**

Please find attached the redacted [Method Statement](https://devoncc.sharepoint.com/:b:/s/PublicDocs/InfoMgt/IQDz6PaXTsmfS5g7G3Sxuq2PAfqxZT2I2QdDsr7aaXyc-QE?e=ioae5l) received from the Contractor.

We have also provided this [space constraints diagram](https://devoncc.sharepoint.com/:b:/s/PublicDocs/InfoMgt/IQBg0T9o6D1vTZ7kInwpVV70ARt6S_2nQBZMdptXsg10zFQ?e=eGcvkH). This does not show any temporary works including how the Contractor would install formwork for the concrete.

Some information has been redacted in grey.  This is because the information is exempt from disclosure under Regulation 13(1) of the Environmental Information Regulations 2004 (Personal Data).

Devon County Council cannot disclose personal information, if releasing it would contravene any of the provisions in the UK General Data Protection Regulation.  In this instance release of this information would contravene Principle (a) – Lawful, Fairness, and Transparency – of the UK GDPR and therefore the information is withheld.