Highway Bridges
===============

**Please could you provide me with the following information:**
**\* The number of Highway bridges on your general inspection rota.**

3,448.

**\* The number of retaining walls over 2m tall maintained by the council.**

1,307.

**\* The number of Highway culverts inspected as part of your general inspection rota.**

We don’t currently define any of our structures as culverts because we aren’t happy with the definition used. With a few exceptions, all of the bridges above will be at least 1.5m clear span unless the structure is corrugated steel in which case the minimum span is 0.9m.

**\* The number of personnel in your Highway Structures team – (or personnel specifically responsible for Highway structures).**

37\.

**\* The title and salary scale grades for the positions in the Highway Structures Team.**

Chief Engineer Bridges and Structures L7

Principal Engineer Scale T

Senior Engineer Scale H

Engineer Scale G

Assistant Engineer Scale F

Graduate Engineer Scale E

Technician Scale E

Assistant Technician Scale D

Trainee Technician Scale C

Apprentices Scale A/B

Information on this can be found at the following link [Pay Policy Statement (April 2023 – March 2024)](https://www.devon.gov.uk/factsandfigures/the-council-staffing-and-pay/pay-policy-statement-april-2023-march-2024/).